What we are building right now. These are working photos from active sites — not a polished showcase. For finished work, see the portfolio.
This is the demolition stage of a landed reconstruction. We run skid tanks in and out to cart away the debris, usually eight to fifteen loads over the demolition. A noise monitoring device is set up on the hoarding to keep track of levels while we work.
See the full timeline for job 22PS →
Exterior tiling works, job 37EW. Large tiles laid out with levelling clips to hold the gradient and keep the alignment matched across the floor. Working on it every day to get it finished. Levels checked as we go.
See the full timeline for job 37EW →
Internal demolition underway on this job. We are stripping the interior back and hauling the rubble out by skid tank, lost count of how many we have filled. Next step is the external wall once the inside is cleared.
See the full timeline for job 22PS →
Work in progress on this house. Walls plastered, bathroom tiling going in with levelling clips still on, and the staircase balustrade set. Floor is almost ready for screed to level up before finishing and paint works.
See the full timeline for job 37EW →
Site checked and cleared ahead of piling works. Floor slab has been broken out and the space stripped back to the bare structure. Beams, columns and the existing staircase are exposed so we can see what we are working with. Next step is preparing the ground for the piling.
See the full timeline for job 22PS →
Renovation works on a 3-storey semi-detached house. Over three months of masonry, partition, electrical and plumbing work. Here you can see the ceiling being built up and the floor tiling going in with levelling clips still on. Job is running well and we may finish before the November 2026 completion date.
— Larry @larryhoo89
See the full timeline for job 37EW →
Work in progress on job 37EW. We are forming the window and door openings and smoothing the wall around them ready for installation. Same job we are laying the floor tiles, set out with levelling clips before grouting. Wiring is still run loose while the rooms are being finished.
See the full timeline for job 37EW →