On site now

C13-1 Micropile: Drilling Complete, Depth Confirmed At Ctl-43.20m, Rebar Cage Installation, Water Flushing And Grouting Complete in Marine Parade

Job
22PS
Current stage
Broken concrete and soil
First update
Last update
Record
20 updates, 60 photos
Area
Marine Parade

Builder's site log for job 22PS: dated photos from an active Wong Lye site, posted as the building work moves, newest first. For finished work, see the portfolio.

— Broken concrete and soil are being cleared out of the excavated area

1 day ago 4 photos

Broken concrete and soil are being cleared out of the excavated area.

Broken concrete and soil are being cleared out of the excavated area – job 22PS, 19 Nov, photo 1 of 4Broken concrete and soil are being cleared out of the excavated area – job 22PS, 19 Nov, photo 2 of 4Broken concrete and soil are being cleared out of the excavated area – job 22PS, 19 Nov, photo 3 of 4Broken concrete and soil are being cleared out of the excavated area – job 22PS, 19 Nov, photo 4 of 4

— Casing is being installed and drilling has started on the next pile

8 days ago 2 photos

Casing is being installed and drilling has started on the next pile.

Casing is being installed and drilling has started on the next pile – job 22PS, 13 Nov, photo 1 of 2Casing is being installed and drilling has started on the next pile – job 22PS, 13 Nov, photo 2 of 2

— Pile drilling is complete, the rebar cage is in, and grouting is done

9 days ago 5 photos

Pile drilling is complete, the rebar cage is in, and grouting is done.

Pile drilling is complete, the rebar cage is in, and grouting is done – job 22PS, 12 Nov, photo 1 of 5Pile drilling is complete, the rebar cage is in, and grouting is done – job 22PS, 12 Nov, photo 2 of 5Pile drilling is complete, the rebar cage is in, and grouting is done – job 22PS, 12 Nov, photo 3 of 5Pile drilling is complete, the rebar cage is in, and grouting is done – job 22PS, 12 Nov, photo 4 of 5Pile drilling is complete, the rebar cage is in, and grouting is done – job 22PS, 12 Nov, photo 5 of 5

— Pile stubs with rebar exposed in the excavated trench

11 days ago 2 photos

Pile stubs with rebar exposed in the excavated trench.

Pile stubs with rebar exposed in the excavated trench – job 22PS, 10 Nov, photo 1 of 2Pile stubs with rebar exposed in the excavated trench – job 22PS, 10 Nov, photo 2 of 2

— Pile heads exposed in the excavated pits, with rebar starters visible

2 photos

Pile heads exposed in the excavated pits, with rebar starters visible.

Pile heads exposed in the excavated pits, with rebar starters visible – job 22PS, 7 Nov, photo 1 of 2Pile heads exposed in the excavated pits, with rebar starters visible – job 22PS, 7 Nov, photo 2 of 2

— Rebar cages going in and pile tops poured as foundation work continues

5 photos

Rebar cages going in and pile tops poured as foundation work continues.

Rebar cages going in and pile tops poured as foundation work continues – job 22PS, 6 Nov, photo 1 of 5Rebar cages going in and pile tops poured as foundation work continues – job 22PS, 6 Nov, photo 2 of 5Rebar cages going in and pile tops poured as foundation work continues – job 22PS, 6 Nov, photo 3 of 5Rebar cages going in and pile tops poured as foundation work continues – job 22PS, 6 Nov, photo 4 of 5Rebar cages going in and pile tops poured as foundation work continues – job 22PS, 6 Nov, photo 5 of 5

— Drilling continues, with pile reinforcement set and grouted

3 photos

Drilling continues, with pile reinforcement set and grouted.

Drilling continues, with pile reinforcement set and grouted – job 22PS, 4 Nov, photo 1 of 3Drilling continues, with pile reinforcement set and grouted – job 22PS, 4 Nov, photo 2 of 3Drilling continues, with pile reinforcement set and grouted – job 22PS, 4 Nov, photo 3 of 3

— Depth confirmed, rebar cage installation started, then water flushing and grouting started

4 photos

S9-1 depth confirmed at CTL-43.20m, rebar cage installation started, then water flushing and grouting started.

Depth confirmed, rebar cage installation started, then water flushing and grouting started – job 22PS, 25 Oct, photo 1 of 4Depth confirmed, rebar cage installation started, then water flushing and grouting started – job 22PS, 25 Oct, photo 2 of 4Depth confirmed, rebar cage installation started, then water flushing and grouting started – job 22PS, 25 Oct, photo 3 of 4Depth confirmed, rebar cage installation started, then water flushing and grouting started – job 22PS, 25 Oct, photo 4 of 4

— Drilled and depth confirmed, rods dismantled, then water flushing and grouting complete

4 photos

S9-2 drilled and depth confirmed, rods dismantled, then water flushing and grouting complete.

Drilled and depth confirmed, rods dismantled, then water flushing and grouting complete – job 22PS, 23 Oct, photo 1 of 4Drilled and depth confirmed, rods dismantled, then water flushing and grouting complete – job 22PS, 23 Oct, photo 2 of 4Drilled and depth confirmed, rods dismantled, then water flushing and grouting complete – job 22PS, 23 Oct, photo 3 of 4Drilled and depth confirmed, rods dismantled, then water flushing and grouting complete – job 22PS, 23 Oct, photo 4 of 4

— Drilling work started

3 photos

S9-2 drilling work started. Pile heads exposed in the excavated pit.

Drilling work started – job 22PS, 22 Oct, photo 1 of 3Drilling work started – job 22PS, 22 Oct, photo 2 of 3Drilling work started – job 22PS, 22 Oct, photo 3 of 3

— Micropile drilling complete, depth confirmed, rebar cage installation, water flushing and grouting complete

4 photos

C13-1 micropile: drilling complete, depth confirmed at CTL-43.20m, rebar cage installation, water flushing and grouting complete.

Micropile drilling complete – job 22PS, 21 Oct, photo 1 of 4Micropile drilling complete – job 22PS, 21 Oct, photo 2 of 4Micropile drilling complete – job 22PS, 21 Oct, photo 3 of 4Micropile drilling complete – job 22PS, 21 Oct, photo 4 of 4

— Casing installation started with the rig checked level, then drilling began

3 photos

22PS — C13-2 under way: casing installation started with the rig checked level, then Dia 300 drilling began.

Casing installation started with the rig checked level, then drilling began – job 22PS, 19 Oct, photo 1 of 3Casing installation started with the rig checked level, then drilling began – job 22PS, 19 Oct, photo 2 of 3Casing installation started with the rig checked level, then drilling began – job 22PS, 19 Oct, photo 3 of 3

— We are configuring the lift pit and position of underground beam connection while the piling is happening

2 photos

We are configuring the lift pit and position of underground beam connection while the piling is happening.

We are configuring the lift pit – job 22PS, 6 Oct, photo 1 of 2We are configuring the lift pit – job 22PS, 6 Oct, photo 2 of 2

— Piling has started

3 photos

Piling has started at 22PS. The job is 30 piles and 17 columns. We put a tarpaulin canopy over the rig so the team can work in the shade. The mixing and pumping equipment is set up in the front yard.

Piling has started – job 22PS, 15 Sep, photo 1 of 3Piling has started – job 22PS, 15 Sep, photo 2 of 3Piling has started – job 22PS, 15 Sep, photo 3 of 3

— Setting out before piling starts

2 photos

Setting out at 22PS before piling starts. The surveyor is taking levels on site and again from the road at the front boundary. Noise barrier sheeting is up around the perimeter. Piling starts next week.

Setting out before piling starts – job 22PS, 6 Sep, photo 1 of 2Setting out before piling starts – job 22PS, 6 Sep, photo 2 of 2

— Reconstruct job in progress

1 photo

Reconstruct job in progress. Before we take anything down we work out what can be removed and how to remove it safely. We do it slowly so the debris stays on our side and does not fly across to the neighbours. Scaffold up, walls opened, brick cleared as we go.

Reconstruct job in progress – job 22PS, 13 Aug

— Demolition and strip-out, getting the site ready for piling works

3 photos

Demolition and strip-out on job 22PS, getting the site ready for piling works. Roof covering came off to expose the timber and the structure, and the internal walls were taken down. Not a straightforward demolition. A lot of hurdles to solve before we could clear the ground.

Demolition and strip-out, getting the site ready for piling works – job 22PS, 13 Aug, photo 1 of 3Demolition and strip-out, getting the site ready for piling works – job 22PS, 13 Aug, photo 2 of 3Demolition and strip-out, getting the site ready for piling works – job 22PS, 13 Aug, photo 3 of 3

— This is the demolition stage of a landed reconstruction

2 photos

This is the demolition stage of a landed reconstruction. We run skid tanks in and out to cart away the debris, usually eight to fifteen loads over the demolition. A noise monitoring device is set up on the hoarding to keep track of levels while we work.

This is the demolition stage of a landed reconstruction – job 22PS, 8 Aug, photo 1 of 2This is the demolition stage of a landed reconstruction – job 22PS, 8 Aug, photo 2 of 2

— Internal demolition underway on this job

4 photos

Internal demolition underway on this job. We are stripping the interior back and hauling the rubble out by skid tank, lost count of how many we have filled. Next step is the external wall once the inside is cleared.

Internal demolition underway on this job – job 22PS, 4 Aug, photo 1 of 4Internal demolition underway on this job – job 22PS, 4 Aug, photo 2 of 4Internal demolition underway on this job – job 22PS, 4 Aug, photo 3 of 4Internal demolition underway on this job – job 22PS, 4 Aug, photo 4 of 4

— Site checked and cleared ahead of piling works

2 photos

Site checked and cleared ahead of piling works. Floor slab has been broken out and the space stripped back to the bare structure. Beams, columns and the existing staircase are exposed so we can see what we are working with. Next step is preparing the ground for the piling.

Site checked and cleared ahead of piling works – job 22PS, 29 Jul, photo 1 of 2Site checked and cleared ahead of piling works – job 22PS, 29 Jul, photo 2 of 2