Selected work · 14 projects · 181 photos

Project Photos: Landed Builds & Heavy Works

Every photo here is from a real Wong Lye job in Singapore - landed house A&A, steel mezzanines, storage racking, solar canopies and metal fabrication. Projects are listed under an anonymised job code; no client names or addresses are published.

Landed Build · A&A works · 13 photos

Landed house A&A with new facade, staircase and interiors (39EW)

A two-storey landed house taken from its original cream facade through demolition to a dark, timber-clad frontage with a glass balcony screen. Inside: a timber-tread staircase with a slatted arched display niche beneath it, a tiled bathroom, an outdoor bar and a covered deck with a stone water-feature wall.

Before & after

Before: the original two-storey house with a cream facade, tiled roof and timber gate - Landed house A&A with new facade, staircase and interiors (39EW) | Wong Lye, BCA General Builder Class 2, Singapore
Before: the original two-storey house with a cream facade, tiled roof and timber gate
After: the completed front elevation with timber cladding, dark panels and glass balcony balustrade - Landed house A&A with new facade, staircase and interiors (39EW) | Wong Lye, BCA General Builder Class 2, Singapore
After: the completed front elevation with timber cladding, dark panels and glass balcony balustrade
During demolition: the ground floor stripped back with the ceiling opened up and rubble on the slab - Landed house A&A with new facade, staircase and interiors (39EW) | Wong Lye, BCA General Builder Class 2, Singapore
Before During demolition: the ground floor stripped back with the ceiling opened up and rubble on the slab
After: open-plan living and dining area with the new staircase and a timber-slat display niche built under it - Landed house A&A with new facade, staircase and interiors (39EW) | Wong Lye, BCA General Builder Class 2, Singapore
After: open-plan living and dining area with the new staircase and a timber-slat display niche built under it
During works: the bare internal staircase before finishes, with wiring still exposed - Landed house A&A with new facade, staircase and interiors (39EW) | Wong Lye, BCA General Builder Class 2, Singapore
Before During works: the bare internal staircase before finishes, with wiring still exposed
After: close view of the arched display cabinet set into the timber-slat wall beneath the stairs, wine fridge alongside - Landed house A&A with new facade, staircase and interiors (39EW) | Wong Lye, BCA General Builder Class 2, Singapore
After: close view of the arched display cabinet set into the timber-slat wall beneath the stairs, wine fridge alongside

Gallery

Front elevation after A&A - dark panelled and timber-clad facade, glass balcony screen and a black metal gate - Landed house A&A with new facade, staircase and interiors (39EW) | Wong Lye, BCA General Builder Class 2, Singapore
Front elevation after A&A - dark panelled and timber-clad facade, glass balcony screen and a black metal gate
Timber pivot front door with a black frame and glass side panel at the entrance - Landed house A&A with new facade, staircase and interiors (39EW) | Wong Lye, BCA General Builder Class 2, Singapore
Timber pivot front door with a black frame and glass side panel at the entrance
Looking up the timber-clad and dark-panelled facade from the driveway - Landed house A&A with new facade, staircase and interiors (39EW) | Wong Lye, BCA General Builder Class 2, Singapore
Looking up the timber-clad and dark-panelled facade from the driveway
Outdoor bar counter with a timber top, two white bar stools and a round mirror on a white wall - Landed house A&A with new facade, staircase and interiors (39EW) | Wong Lye, BCA General Builder Class 2, Singapore
Outdoor bar counter with a timber top, two white bar stools and a round mirror on a white wall
Top-down view of the timber-tread staircase with a black metal balustrade - Landed house A&A with new facade, staircase and interiors (39EW) | Wong Lye, BCA General Builder Class 2, Singapore
Top-down view of the timber-tread staircase with a black metal balustrade
Bathroom with green wall tiles, a patterned feature-tile panel and a built-in bathtub - Landed house A&A with new facade, staircase and interiors (39EW) | Wong Lye, BCA General Builder Class 2, Singapore
Bathroom with green wall tiles, a patterned feature-tile panel and a built-in bathtub
Covered outdoor deck with a timber pergola ceiling and a stone-clad water-feature wall with two spouts - Landed house A&A with new facade, staircase and interiors (39EW) | Wong Lye, BCA General Builder Class 2, Singapore
Covered outdoor deck with a timber pergola ceiling and a stone-clad water-feature wall with two spouts
Landed Build · A&A works · 21 photos

Terrace house A&A with new facade and full interior (3TBA)

An older terrace house with a tiled roof, window grilles and terrazzo floors, reworked with a white rendered facade, a horizontal-slat gate and a glass balcony screen. Inside, an open-plan living and dining area with a black-framed staircase, a stone-splashback kitchen with an island, new bathrooms, bedrooms and a home study.

Before & after

Before: the original terrace house with a pitched tiled roof, black metal fence and gate - Terrace house A&A with new facade and full interior (3TBA) | Wong Lye, BCA General Builder Class 2, Singapore
Before: the original terrace house with a pitched tiled roof, black metal fence and gate
After: the completed frontage with a slatted gate, glass balcony screen and ceiling fans on the porch - Terrace house A&A with new facade and full interior (3TBA) | Wong Lye, BCA General Builder Class 2, Singapore
After: the completed frontage with a slatted gate, glass balcony screen and ceiling fans on the porch
Before: the original kitchen and dining area with dark floor tiles and window grilles - Terrace house A&A with new facade and full interior (3TBA) | Wong Lye, BCA General Builder Class 2, Singapore
Before: the original kitchen and dining area with dark floor tiles and window grilles
After: kitchen with a stone-pattern splashback, white overhead cabinets and dark timber-grain base units - Terrace house A&A with new facade and full interior (3TBA) | Wong Lye, BCA General Builder Class 2, Singapore
After: kitchen with a stone-pattern splashback, white overhead cabinets and dark timber-grain base units
Before: the original living room with a terrazzo floor and a timber-balustrade staircase - Terrace house A&A with new facade and full interior (3TBA) | Wong Lye, BCA General Builder Class 2, Singapore
Before: the original living room with a terrazzo floor and a timber-balustrade staircase
After: open-plan living area with marble-look floor tiles and a black-framed staircase to the upper floor - Terrace house A&A with new facade and full interior (3TBA) | Wong Lye, BCA General Builder Class 2, Singapore
After: open-plan living area with marble-look floor tiles and a black-framed staircase to the upper floor

Gallery

Front elevation after A&A - white rendered terrace house with a horizontal-slat metal gate and glass balcony screen - Terrace house A&A with new facade and full interior (3TBA) | Wong Lye, BCA General Builder Class 2, Singapore
Front elevation after A&A - white rendered terrace house with a horizontal-slat metal gate and glass balcony screen
Bedroom sitting corner with two armchairs and glass doors opening to the balcony - Terrace house A&A with new facade and full interior (3TBA) | Wong Lye, BCA General Builder Class 2, Singapore
Bedroom sitting corner with two armchairs and glass doors opening to the balcony
Bedroom with a leather armchair and sheer curtains - Terrace house A&A with new facade and full interior (3TBA) | Wong Lye, BCA General Builder Class 2, Singapore
Bedroom with a leather armchair and sheer curtains
Bathroom with beige stone-look wall tiles and a window fitted with white plantation shutters - Terrace house A&A with new facade and full interior (3TBA) | Wong Lye, BCA General Builder Class 2, Singapore
Bathroom with beige stone-look wall tiles and a window fitted with white plantation shutters
Bathroom vanity with a wall mirror and a timber drawer unit against grey tiled walls - Terrace house A&A with new facade and full interior (3TBA) | Wong Lye, BCA General Builder Class 2, Singapore
Bathroom vanity with a wall mirror and a timber drawer unit against grey tiled walls
Living room with a light sofa, an arc floor lamp and the staircase beyond - Terrace house A&A with new facade and full interior (3TBA) | Wong Lye, BCA General Builder Class 2, Singapore
Living room with a light sofa, an arc floor lamp and the staircase beyond
Balcony with a striped awning, a metal louvre screen and a small white bistro table - Terrace house A&A with new facade and full interior (3TBA) | Wong Lye, BCA General Builder Class 2, Singapore
Balcony with a striped awning, a metal louvre screen and a small white bistro table
Home study seen through a black-framed glass door - desk, chair and drawer unit - Terrace house A&A with new facade and full interior (3TBA) | Wong Lye, BCA General Builder Class 2, Singapore
Home study seen through a black-framed glass door - desk, chair and drawer unit
Timber pivot front door with a black frame and glass side panels - Terrace house A&A with new facade and full interior (3TBA) | Wong Lye, BCA General Builder Class 2, Singapore
Timber pivot front door with a black frame and glass side panels
The timber front door seen from inside, with glass side panels and a dark stone floor - Terrace house A&A with new facade and full interior (3TBA) | Wong Lye, BCA General Builder Class 2, Singapore
The timber front door seen from inside, with glass side panels and a dark stone floor
Black-framed glass bi-fold doors between rooms, with the timber front door to the right - Terrace house A&A with new facade and full interior (3TBA) | Wong Lye, BCA General Builder Class 2, Singapore
Black-framed glass bi-fold doors between rooms, with the timber front door to the right
Open-plan living and dining with an L-shaped sofa, dining table and a black-framed staircase with timber treads - Terrace house A&A with new facade and full interior (3TBA) | Wong Lye, BCA General Builder Class 2, Singapore
Open-plan living and dining with an L-shaped sofa, dining table and a black-framed staircase with timber treads
Kitchen run with a stone-pattern splashback, under-cabinet lighting and dark timber-grain cabinets - Terrace house A&A with new facade and full interior (3TBA) | Wong Lye, BCA General Builder Class 2, Singapore
Kitchen run with a stone-pattern splashback, under-cabinet lighting and dark timber-grain cabinets
Hallway with flush white doors and built-in wardrobes over a timber floor - Terrace house A&A with new facade and full interior (3TBA) | Wong Lye, BCA General Builder Class 2, Singapore
Hallway with flush white doors and built-in wardrobes over a timber floor
Kitchen island with a stone-pattern top, pendant lights and a bar stool beside a louvred window - Terrace house A&A with new facade and full interior (3TBA) | Wong Lye, BCA General Builder Class 2, Singapore
Kitchen island with a stone-pattern top, pendant lights and a bar stool beside a louvred window
Metal Fabrication · Metal fabrication - storage racking · 17 photos

Heavy-duty racking for boats and jet skis (Sentosa)

Steel racking built inside a covered boat storage shed: blue uprights and orange beams fitted with galvanised bunk brackets and timber bunks, stacking jet skis five tiers high and boats on two and three tiers, with safe-working-load labels on the beams.

Five-tier steel rack with blue uprights and orange beams holding jet skis, standing at the edge of the storage shed - Heavy-duty racking for boats and jet skis (Sentosa) | Wong Lye, BCA General Builder Class 2, Singapore
Five-tier steel rack with blue uprights and orange beams holding jet skis, standing at the edge of the storage shed
Multi-tier jet ski rack inside a shed bay, seen head-on - Heavy-duty racking for boats and jet skis (Sentosa) | Wong Lye, BCA General Builder Class 2, Singapore
Multi-tier jet ski rack inside a shed bay, seen head-on
Wide view of two-tier boat racking under the shed, boats resting on bunks across several bays - Heavy-duty racking for boats and jet skis (Sentosa) | Wong Lye, BCA General Builder Class 2, Singapore
Wide view of two-tier boat racking under the shed, boats resting on bunks across several bays
Row of two-tier boat racks seen from the apron, boats stored on the upper beams - Heavy-duty racking for boats and jet skis (Sentosa) | Wong Lye, BCA General Builder Class 2, Singapore
Row of two-tier boat racks seen from the apron, boats stored on the upper beams
Boat hull resting on timber bunks mounted on the orange racking beams - Heavy-duty racking for boats and jet skis (Sentosa) | Wong Lye, BCA General Builder Class 2, Singapore
Boat hull resting on timber bunks mounted on the orange racking beams
Blue uprights and orange beams seen from below a stored boat - Heavy-duty racking for boats and jet skis (Sentosa) | Wong Lye, BCA General Builder Class 2, Singapore
Blue uprights and orange beams seen from below a stored boat
Galvanised bunk bracket bolted to an orange beam, with the timber bunk fixed on top - Heavy-duty racking for boats and jet skis (Sentosa) | Wong Lye, BCA General Builder Class 2, Singapore
Galvanised bunk bracket bolted to an orange beam, with the timber bunk fixed on top
Bunk bracket bolted through the racking beam, seen from underneath - Heavy-duty racking for boats and jet skis (Sentosa) | Wong Lye, BCA General Builder Class 2, Singapore
Bunk bracket bolted through the racking beam, seen from underneath
Line of bunk brackets along a beam carrying a boat, with the safe working load label visible - Heavy-duty racking for boats and jet skis (Sentosa) | Wong Lye, BCA General Builder Class 2, Singapore
Line of bunk brackets along a beam carrying a boat, with the safe working load label visible
Panoramic view of the boat racking bays under the shed roof - Heavy-duty racking for boats and jet skis (Sentosa) | Wong Lye, BCA General Builder Class 2, Singapore
Panoramic view of the boat racking bays under the shed roof
Tall racking with boats stacked three tiers high and a ladder alongside - Heavy-duty racking for boats and jet skis (Sentosa) | Wong Lye, BCA General Builder Class 2, Singapore
Tall racking with boats stacked three tiers high and a ladder alongside
Boats on the upper tiers of the racking, looking up from the aisle - Heavy-duty racking for boats and jet skis (Sentosa) | Wong Lye, BCA General Builder Class 2, Singapore
Boats on the upper tiers of the racking, looking up from the aisle
Boat on an upper tier of the blue steel racking, seen from the aisle - Heavy-duty racking for boats and jet skis (Sentosa) | Wong Lye, BCA General Builder Class 2, Singapore
Boat on an upper tier of the blue steel racking, seen from the aisle
Two-tier boat racks along the shed with bunk brackets in the foreground - Heavy-duty racking for boats and jet skis (Sentosa) | Wong Lye, BCA General Builder Class 2, Singapore
Two-tier boat racks along the shed with bunk brackets in the foreground
Front view of the five-tier jet ski rack with jet skis on every level - Heavy-duty racking for boats and jet skis (Sentosa) | Wong Lye, BCA General Builder Class 2, Singapore
Front view of the five-tier jet ski rack with jet skis on every level
Racking bay with boats and outboard motors stored on the tiers, wet floor below - Heavy-duty racking for boats and jet skis (Sentosa) | Wong Lye, BCA General Builder Class 2, Singapore
Racking bay with boats and outboard motors stored on the tiers, wet floor below
Jet ski on the ground tier with boats racked on the levels above - Heavy-duty racking for boats and jet skis (Sentosa) | Wong Lye, BCA General Builder Class 2, Singapore
Jet ski on the ground tier with boats racked on the levels above
Metal Fabrication · Metal fabrication - mezzanine floor · 7 photos

Steel mezzanine floor with staircase in a factory unit (OverseaFactory)

A steel mezzanine built inside a factory unit, with a black mesh balustrade, hazard-striped edge and a checker-plate staircase, giving a second level of floor space above the forklift and pallet area. The deck is finished in a grey coating with ceiling-mounted air conditioning.

Steel mezzanine with a black mesh balustrade and checker-plate staircase inside a factory unit, yellow timber barriers below - Steel mezzanine floor with staircase in a factory unit (OverseaFactory) | Wong Lye, BCA General Builder Class 2, Singapore
Steel mezzanine with a black mesh balustrade and checker-plate staircase inside a factory unit, yellow timber barriers below
The mezzanine seen from the factory floor, with a forklift and stacked pallets stored beneath it - Steel mezzanine floor with staircase in a factory unit (OverseaFactory) | Wong Lye, BCA General Builder Class 2, Singapore
The mezzanine seen from the factory floor, with a forklift and stacked pallets stored beneath it
On the mezzanine deck - grey-coated floor, mesh balustrade and ceiling-mounted air conditioning - Steel mezzanine floor with staircase in a factory unit (OverseaFactory) | Wong Lye, BCA General Builder Class 2, Singapore
On the mezzanine deck - grey-coated floor, mesh balustrade and ceiling-mounted air conditioning
Mezzanine deck edge with the mesh balustrade, wall fan and cassette air-conditioning unit - Steel mezzanine floor with staircase in a factory unit (OverseaFactory) | Wong Lye, BCA General Builder Class 2, Singapore
Mezzanine deck edge with the mesh balustrade, wall fan and cassette air-conditioning unit
Empty mezzanine deck with a grey coated floor and the mesh balustrade along its edge - Steel mezzanine floor with staircase in a factory unit (OverseaFactory) | Wong Lye, BCA General Builder Class 2, Singapore
Empty mezzanine deck with a grey coated floor and the mesh balustrade along its edge
The mezzanine from below at an angle, showing the staircase and the hazard-striped edge - Steel mezzanine floor with staircase in a factory unit (OverseaFactory) | Wong Lye, BCA General Builder Class 2, Singapore
The mezzanine from below at an angle, showing the staircase and the hazard-striped edge
Underside of the mezzanine and staircase with pallets stored below - Steel mezzanine floor with staircase in a factory unit (OverseaFactory) | Wong Lye, BCA General Builder Class 2, Singapore
Underside of the mezzanine and staircase with pallets stored below
Metal Fabrication · Metal fabrication - loft and staircase · 14 photos

Office loft with a cantilevered steel and timber staircase (HomeOffice)

A high-ceiling office unit fitted with a mesh-railed loft floor and a staircase of cantilevered timber treads on a single steel stringer, with a blue accent wall and timber-look flooring below and carpet tiles on the loft.

Office with a timber-tread steel staircase rising to a mesh-railed loft, blue accent wall and timber-look floor - Office loft with a cantilevered steel and timber staircase (HomeOffice) | Wong Lye, BCA General Builder Class 2, Singapore
Office with a timber-tread steel staircase rising to a mesh-railed loft, blue accent wall and timber-look floor
The loft staircase beside full-height windows with a view over neighbouring buildings - Office loft with a cantilevered steel and timber staircase (HomeOffice) | Wong Lye, BCA General Builder Class 2, Singapore
The loft staircase beside full-height windows with a view over neighbouring buildings
Cantilevered timber treads fixed to a central steel stringer - Office loft with a cantilevered steel and timber staircase (HomeOffice) | Wong Lye, BCA General Builder Class 2, Singapore
Cantilevered timber treads fixed to a central steel stringer
Loft edge with black mesh railing above the doorway and the staircase to the right - Office loft with a cantilevered steel and timber staircase (HomeOffice) | Wong Lye, BCA General Builder Class 2, Singapore
Loft edge with black mesh railing above the doorway and the staircase to the right
Staircase with a timber handrail leading up to the mesh-railed loft - Office loft with a cantilevered steel and timber staircase (HomeOffice) | Wong Lye, BCA General Builder Class 2, Singapore
Staircase with a timber handrail leading up to the mesh-railed loft
Underside detail of the cantilevered treads on the steel spine - Office loft with a cantilevered steel and timber staircase (HomeOffice) | Wong Lye, BCA General Builder Class 2, Singapore
Underside detail of the cantilevered treads on the steel spine
Close view of the loft's mesh railing and timber handrail beside a window - Office loft with a cantilevered steel and timber staircase (HomeOffice) | Wong Lye, BCA General Builder Class 2, Singapore
Close view of the loft's mesh railing and timber handrail beside a window
Loft level with carpet-tile flooring, mesh railing and a blue painted ceiling - Office loft with a cantilevered steel and timber staircase (HomeOffice) | Wong Lye, BCA General Builder Class 2, Singapore
Loft level with carpet-tile flooring, mesh railing and a blue painted ceiling
Loft level looking towards the window, carpet tiles underfoot - Office loft with a cantilevered steel and timber staircase (HomeOffice) | Wong Lye, BCA General Builder Class 2, Singapore
Loft level looking towards the window, carpet tiles underfoot
The loft's mesh railing seen from the staircase, blue wall behind - Office loft with a cantilevered steel and timber staircase (HomeOffice) | Wong Lye, BCA General Builder Class 2, Singapore
The loft's mesh railing seen from the staircase, blue wall behind
Staircase with timber treads and a black steel railing at the loft edge, wall-mounted air conditioner beside it - Office loft with a cantilevered steel and timber staircase (HomeOffice) | Wong Lye, BCA General Builder Class 2, Singapore
Staircase with timber treads and a black steel railing at the loft edge, wall-mounted air conditioner beside it
View from the doorway of the staircase and loft over the timber-look floor - Office loft with a cantilevered steel and timber staircase (HomeOffice) | Wong Lye, BCA General Builder Class 2, Singapore
View from the doorway of the staircase and loft over the timber-look floor
The staircase with potted plants beside a window - Office loft with a cantilevered steel and timber staircase (HomeOffice) | Wong Lye, BCA General Builder Class 2, Singapore
The staircase with potted plants beside a window
Open shelving units in black and timber beside a door, with a wall-mounted air conditioner above - Office loft with a cantilevered steel and timber staircase (HomeOffice) | Wong Lye, BCA General Builder Class 2, Singapore
Open shelving units in black and timber beside a door, with a wall-mounted air conditioner above
Metal Fabrication · Metal fabrication - loft platform · 7 photos

Steel loft platform with staircase in an industrial unit (Loft)

A black steel loft platform on posts inside an industrial unit, with a mesh balustrade, a timber-tread staircase with black railings, a dark-coated loft floor and shelving fitted in the space beneath.

Black steel loft platform over a shelving area, with a timber-tread staircase and black railing - Steel loft platform with staircase in an industrial unit (Loft) | Wong Lye, BCA General Builder Class 2, Singapore
Black steel loft platform over a shelving area, with a timber-tread staircase and black railing
The loft from the side - timber-tread staircase, shelving under the platform and lighting fixed beneath it - Steel loft platform with staircase in an industrial unit (Loft) | Wong Lye, BCA General Builder Class 2, Singapore
The loft from the side - timber-tread staircase, shelving under the platform and lighting fixed beneath it
On the loft - dark-coated floor with a mesh balustrade around the edge and the stair opening - Steel loft platform with staircase in an industrial unit (Loft) | Wong Lye, BCA General Builder Class 2, Singapore
On the loft - dark-coated floor with a mesh balustrade around the edge and the stair opening
Loft floor looking out over the unit, mesh balustrade in front and exposed ducting at the ceiling - Steel loft platform with staircase in an industrial unit (Loft) | Wong Lye, BCA General Builder Class 2, Singapore
Loft floor looking out over the unit, mesh balustrade in front and exposed ducting at the ceiling
Loft edge with mesh balustrade panels and the stair handrail - Steel loft platform with staircase in an industrial unit (Loft) | Wong Lye, BCA General Builder Class 2, Singapore
Loft edge with mesh balustrade panels and the stair handrail
Looking down the timber-tread staircase from the loft, with a desk and green glass partition below - Steel loft platform with staircase in an industrial unit (Loft) | Wong Lye, BCA General Builder Class 2, Singapore
Looking down the timber-tread staircase from the loft, with a desk and green glass partition below
The loft platform and staircase seen from the floor of the unit - Steel loft platform with staircase in an industrial unit (Loft) | Wong Lye, BCA General Builder Class 2, Singapore
The loft platform and staircase seen from the floor of the unit
Metal Fabrication · Metal fabrication - solar canopy · 12 photos

Rooftop steel canopy carrying solar panels (M28)

A red-painted steel canopy over a rooftop terrace with solar panels forming its roof, plus rows of panels on frames across the flat roof.

Solar panels on a flat roof, with surrounding rooftops and open land beyond - Rooftop steel canopy carrying solar panels (M28) | Wong Lye, BCA General Builder Class 2, Singapore
Solar panels on a flat roof, with surrounding rooftops and open land beyond
Red-painted steel canopy over a rooftop terrace with panels on top, beside the rooftop room - Rooftop steel canopy carrying solar panels (M28) | Wong Lye, BCA General Builder Class 2, Singapore
Red-painted steel canopy over a rooftop terrace with panels on top, beside the rooftop room
Underside of the steel canopy with the solar panels forming its roof - Rooftop steel canopy carrying solar panels (M28) | Wong Lye, BCA General Builder Class 2, Singapore
Underside of the steel canopy with the solar panels forming its roof
Solar panels held in the steel canopy frame, seen from below - Rooftop steel canopy carrying solar panels (M28) | Wong Lye, BCA General Builder Class 2, Singapore
Solar panels held in the steel canopy frame, seen from below
The canopy over the terrace next to the rooftop room, ladder against the wall - Rooftop steel canopy carrying solar panels (M28) | Wong Lye, BCA General Builder Class 2, Singapore
The canopy over the terrace next to the rooftop room, ladder against the wall
The canopy from below at the side, with a frangipani tree in the foreground - Rooftop steel canopy carrying solar panels (M28) | Wong Lye, BCA General Builder Class 2, Singapore
The canopy from below at the side, with a frangipani tree in the foreground
Solar panels on a tilted frame at the roof edge, looking out over open land - Rooftop steel canopy carrying solar panels (M28) | Wong Lye, BCA General Builder Class 2, Singapore
Solar panels on a tilted frame at the roof edge, looking out over open land
The steel canopy over the rooftop terrace with a planter and step beneath it - Rooftop steel canopy carrying solar panels (M28) | Wong Lye, BCA General Builder Class 2, Singapore
The steel canopy over the rooftop terrace with a planter and step beneath it
Panel array on a red steel frame at the edge of the roof - Rooftop steel canopy carrying solar panels (M28) | Wong Lye, BCA General Builder Class 2, Singapore
Panel array on a red steel frame at the edge of the roof
Rows of solar panels laid across the flat roof - Rooftop steel canopy carrying solar panels (M28) | Wong Lye, BCA General Builder Class 2, Singapore
Rows of solar panels laid across the flat roof
Under the canopy - the terrace with a scaffold and ladder, neighbouring buildings beyond - Rooftop steel canopy carrying solar panels (M28) | Wong Lye, BCA General Builder Class 2, Singapore
Under the canopy - the terrace with a scaffold and ladder, neighbouring buildings beyond
Solar panels on the roof with a timber board in the foreground - Rooftop steel canopy carrying solar panels (M28) | Wong Lye, BCA General Builder Class 2, Singapore
Solar panels on the roof with a timber board in the foreground
Metal Fabrication · Metal fabrication - mezzanine floor · 9 photos

Steel mezzanine platform in a factory (M22)

A blue-painted steel mezzanine with a galvanised grating deck, railings and an access stair inside a factory, shown from the crane delivery of the steel sections and the site briefing through to the finished platform.

Blue steel mezzanine platform with railings, staircase and a grating deck inside a factory - Steel mezzanine platform in a factory (M22) | Wong Lye, BCA General Builder Class 2, Singapore
Blue steel mezzanine platform with railings, staircase and a grating deck inside a factory
Crane lorry unloading steel sections in the yard, with workers in high-visibility vests and traffic cones - Steel mezzanine platform in a factory (M22) | Wong Lye, BCA General Builder Class 2, Singapore
Crane lorry unloading steel sections in the yard, with workers in high-visibility vests and traffic cones
Steel beams lifted off the lorry on crane chains, workers guiding the load - Steel mezzanine platform in a factory (M22) | Wong Lye, BCA General Builder Class 2, Singapore
Steel beams lifted off the lorry on crane chains, workers guiding the load
Site briefing - workers in safety helmets gathered inside the warehouse - Steel mezzanine platform in a factory (M22) | Wong Lye, BCA General Builder Class 2, Singapore
Site briefing - workers in safety helmets gathered inside the warehouse
Galvanised steel channel sections laid out in the yard - Steel mezzanine platform in a factory (M22) | Wong Lye, BCA General Builder Class 2, Singapore
Galvanised steel channel sections laid out in the yard
Blue steel mezzanine frame with railings above the shelving, under the factory roof - Steel mezzanine platform in a factory (M22) | Wong Lye, BCA General Builder Class 2, Singapore
Blue steel mezzanine frame with railings above the shelving, under the factory roof
Close view of the galvanised grating deck panels on the mezzanine - Steel mezzanine platform in a factory (M22) | Wong Lye, BCA General Builder Class 2, Singapore
Close view of the galvanised grating deck panels on the mezzanine
Mezzanine deck with blue railings beneath the factory roof trusses - Steel mezzanine platform in a factory (M22) | Wong Lye, BCA General Builder Class 2, Singapore
Mezzanine deck with blue railings beneath the factory roof trusses
Pallet racking loaded with goods beside the mezzanine deck - Steel mezzanine platform in a factory (M22) | Wong Lye, BCA General Builder Class 2, Singapore
Pallet racking loaded with goods beside the mezzanine deck
Metal Fabrication · Metal fabrication - pallet racking · 6 photos

Pallet racking beams and frames stacked in a warehouse (M12)

Bundles of orange racking beams, blue upright frames and galvanised deck panels stacked in a warehouse.

Panoramic view of a warehouse stacked with bundled orange racking beams and blue uprights - Pallet racking beams and frames stacked in a warehouse (M12) | Wong Lye, BCA General Builder Class 2, Singapore
Panoramic view of a warehouse stacked with bundled orange racking beams and blue uprights
Bundles of orange racking beams and blue upright frames in the warehouse - Pallet racking beams and frames stacked in a warehouse (M12) | Wong Lye, BCA General Builder Class 2, Singapore
Bundles of orange racking beams and blue upright frames in the warehouse
Stacked blue upright frames with orange beams bundled on top - Pallet racking beams and frames stacked in a warehouse (M12) | Wong Lye, BCA General Builder Class 2, Singapore
Stacked blue upright frames with orange beams bundled on top
Shrink-wrapped bundles of orange racking beams stacked on blue frames - Pallet racking beams and frames stacked in a warehouse (M12) | Wong Lye, BCA General Builder Class 2, Singapore
Shrink-wrapped bundles of orange racking beams stacked on blue frames
Warehouse with racking components stacked in rows - Pallet racking beams and frames stacked in a warehouse (M12) | Wong Lye, BCA General Builder Class 2, Singapore
Warehouse with racking components stacked in rows
Orange beams, blue uprights and galvanised deck panels stacked ready - Pallet racking beams and frames stacked in a warehouse (M12) | Wong Lye, BCA General Builder Class 2, Singapore
Orange beams, blue uprights and galvanised deck panels stacked ready
Metal Fabrication · Metal fabrication - mezzanine floor · 2 photos

Steel mezzanine floor with staircase in a factory unit (M10)

A steel mezzanine inside a factory unit with a black mesh balustrade, hazard-striped edge and a checker-plate staircase, giving a second level of floor space above the forklift and pallet area.

Steel mezzanine with a black mesh balustrade and checker-plate staircase inside a factory unit, yellow timber barriers below - Steel mezzanine floor with staircase in a factory unit (M10) | Wong Lye, BCA General Builder Class 2, Singapore
Steel mezzanine with a black mesh balustrade and checker-plate staircase inside a factory unit, yellow timber barriers below
The mezzanine seen from the factory floor, with a forklift and stacked pallets stored beneath it - Steel mezzanine floor with staircase in a factory unit (M10) | Wong Lye, BCA General Builder Class 2, Singapore
The mezzanine seen from the factory floor, with a forklift and stacked pallets stored beneath it
Metal Fabrication · Metal fabrication - glass frontage and staircase · 12 photos

Framed glass frontage and steel entrance stair for an industrial unit (M09)

A ground-floor unit given a full-height framed glass frontage, a steel entrance staircase with checker-plate treads and pipe handrails, and glass-partitioned office rooms with timber-look flooring inside.

Full-height framed glass frontage on the ground floor of an industrial building, with the steel entrance stair during works - Framed glass frontage and steel entrance stair for an industrial unit (M09) | Wong Lye, BCA General Builder Class 2, Singapore
Full-height framed glass frontage on the ground floor of an industrial building, with the steel entrance stair during works
The framed glass frontage and steel entrance staircase seen from the driveway - Framed glass frontage and steel entrance stair for an industrial unit (M09) | Wong Lye, BCA General Builder Class 2, Singapore
The framed glass frontage and steel entrance staircase seen from the driveway
Steel entrance staircase with checker-plate treads and a pipe handrail beside the glass wall - Framed glass frontage and steel entrance stair for an industrial unit (M09) | Wong Lye, BCA General Builder Class 2, Singapore
Steel entrance staircase with checker-plate treads and a pipe handrail beside the glass wall
The glass wall seen from inside, trees reflected in the panels - Framed glass frontage and steel entrance stair for an industrial unit (M09) | Wong Lye, BCA General Builder Class 2, Singapore
The glass wall seen from inside, trees reflected in the panels
Framed glass wall panels with the timber-look floor inside - Framed glass frontage and steel entrance stair for an industrial unit (M09) | Wong Lye, BCA General Builder Class 2, Singapore
Framed glass wall panels with the timber-look floor inside
Looking out through the glass frontage to the car park - Framed glass frontage and steel entrance stair for an industrial unit (M09) | Wong Lye, BCA General Builder Class 2, Singapore
Looking out through the glass frontage to the car park
Interior with a glass partition and glass door over timber-look vinyl flooring - Framed glass frontage and steel entrance stair for an industrial unit (M09) | Wong Lye, BCA General Builder Class 2, Singapore
Interior with a glass partition and glass door over timber-look vinyl flooring
View through the glass frontage from inside towards the trees and road - Framed glass frontage and steel entrance stair for an industrial unit (M09) | Wong Lye, BCA General Builder Class 2, Singapore
View through the glass frontage from inside towards the trees and road
Office room with white walls, timber-look floor and internal window panels - Framed glass frontage and steel entrance stair for an industrial unit (M09) | Wong Lye, BCA General Builder Class 2, Singapore
Office room with white walls, timber-look floor and internal window panels
Office room with a glass partition to the front and a window to the side - Framed glass frontage and steel entrance stair for an industrial unit (M09) | Wong Lye, BCA General Builder Class 2, Singapore
Office room with a glass partition to the front and a window to the side
Small room with white walls and timber-look flooring - Framed glass frontage and steel entrance stair for an industrial unit (M09) | Wong Lye, BCA General Builder Class 2, Singapore
Small room with white walls and timber-look flooring
Room with a black door and an internal window - Framed glass frontage and steel entrance stair for an industrial unit (M09) | Wong Lye, BCA General Builder Class 2, Singapore
Room with a black door and an internal window
Metal Fabrication · Metal fabrication - mezzanine structure · 7 photos

Two-level steel mezzanine with staircases (HF0107)

A grey-painted structural steel mezzanine on I-beam columns with metal decking, pipe railings and staircases finished in red checker-plate treads.

Underside of the steel mezzanine - grey-painted I-beams carrying metal decking - Two-level steel mezzanine with staircases (HF0107) | Wong Lye, BCA General Builder Class 2, Singapore
Underside of the steel mezzanine - grey-painted I-beams carrying metal decking
Two-level steel mezzanine structure with staircases and railings inside the building - Two-level steel mezzanine with staircases (HF0107) | Wong Lye, BCA General Builder Class 2, Singapore
Two-level steel mezzanine structure with staircases and railings inside the building
Steel staircase with red checker-plate treads and grey pipe railings - Two-level steel mezzanine with staircases (HF0107) | Wong Lye, BCA General Builder Class 2, Singapore
Steel staircase with red checker-plate treads and grey pipe railings
Underside of the mezzanine decking on grey steel beams and columns - Two-level steel mezzanine with staircases (HF0107) | Wong Lye, BCA General Builder Class 2, Singapore
Underside of the mezzanine decking on grey steel beams and columns
Looking up through the steel framing and the staircase flights - Two-level steel mezzanine with staircases (HF0107) | Wong Lye, BCA General Builder Class 2, Singapore
Looking up through the steel framing and the staircase flights
Mezzanine level with grey steel beams, railing and a stair with red treads - Two-level steel mezzanine with staircases (HF0107) | Wong Lye, BCA General Builder Class 2, Singapore
Mezzanine level with grey steel beams, railing and a stair with red treads
Staircase with red checker-plate treads and grey railings - Two-level steel mezzanine with staircases (HF0107) | Wong Lye, BCA General Builder Class 2, Singapore
Staircase with red checker-plate treads and grey railings
Metal Fabrication · Metal fabrication - cable drum racking · 26 photos

Heavy-duty cable drum racking in a cable yard (TSE)

Long runs of two-tier blue steel racking built to hold cable drums in a covered shed and open yard, shown from the empty site through welding of the steel frames to the loaded racks, plus checker-plate steel dock platforms with a safety railing.

Before & after

Before: the empty covered shed with a lorry parked inside - Heavy-duty cable drum racking in a cable yard (TSE) | Wong Lye, BCA General Builder Class 2, Singapore
Before: the empty covered shed with a lorry parked inside
After: aisle between two-tier blue racks loaded with cable drums - Heavy-duty cable drum racking in a cable yard (TSE) | Wong Lye, BCA General Builder Class 2, Singapore
After: aisle between two-tier blue racks loaded with cable drums
Before: the open yard with trees and drums stored along the fence - Heavy-duty cable drum racking in a cable yard (TSE) | Wong Lye, BCA General Builder Class 2, Singapore
Before: the open yard with trees and drums stored along the fence
After: aisle between the drum racks in the open yard, drums on both sides - Heavy-duty cable drum racking in a cable yard (TSE) | Wong Lye, BCA General Builder Class 2, Singapore
After: aisle between the drum racks in the open yard, drums on both sides

Gallery

Long two-tier blue steel rack holding rows of cable drums under a shed roof - Heavy-duty cable drum racking in a cable yard (TSE) | Wong Lye, BCA General Builder Class 2, Singapore
Long two-tier blue steel rack holding rows of cable drums under a shed roof
Cable drums seated on the blue racking, seen close up - Heavy-duty cable drum racking in a cable yard (TSE) | Wong Lye, BCA General Builder Class 2, Singapore
Cable drums seated on the blue racking, seen close up
Rows of cable drums on the ground tier under the shed roof - Heavy-duty cable drum racking in a cable yard (TSE) | Wong Lye, BCA General Builder Class 2, Singapore
Rows of cable drums on the ground tier under the shed roof
Large cable drums on the blue racking along the aisle - Heavy-duty cable drum racking in a cable yard (TSE) | Wong Lye, BCA General Builder Class 2, Singapore
Large cable drums on the blue racking along the aisle
Aisle between the drum racks, drums on both tiers - Heavy-duty cable drum racking in a cable yard (TSE) | Wong Lye, BCA General Builder Class 2, Singapore
Aisle between the drum racks, drums on both tiers
Blue drum racks with a dark steel frame in the foreground - Heavy-duty cable drum racking in a cable yard (TSE) | Wong Lye, BCA General Builder Class 2, Singapore
Blue drum racks with a dark steel frame in the foreground
Looking up at drums on the upper tier of the racking - Heavy-duty cable drum racking in a cable yard (TSE) | Wong Lye, BCA General Builder Class 2, Singapore
Looking up at drums on the upper tier of the racking
Two-tier drum racks along the yard holding drums of several colours - Heavy-duty cable drum racking in a cable yard (TSE) | Wong Lye, BCA General Builder Class 2, Singapore
Two-tier drum racks along the yard holding drums of several colours
Forklift working beside the loaded drum racks - Heavy-duty cable drum racking in a cable yard (TSE) | Wong Lye, BCA General Builder Class 2, Singapore
Forklift working beside the loaded drum racks
Aisle between two loaded drum racks - Heavy-duty cable drum racking in a cable yard (TSE) | Wong Lye, BCA General Builder Class 2, Singapore
Aisle between two loaded drum racks
Cable drums on the racking, seen from the aisle - Heavy-duty cable drum racking in a cable yard (TSE) | Wong Lye, BCA General Builder Class 2, Singapore
Cable drums on the racking, seen from the aisle
Drum rack with cable drums seated on the beams, close view - Heavy-duty cable drum racking in a cable yard (TSE) | Wong Lye, BCA General Builder Class 2, Singapore
Drum rack with cable drums seated on the beams, close view
Welder working on a steel column joint for the racking frame - Heavy-duty cable drum racking in a cable yard (TSE) | Wong Lye, BCA General Builder Class 2, Singapore
Welder working on a steel column joint for the racking frame
Welder on a boom lift welding the steel racking frame at height - Heavy-duty cable drum racking in a cable yard (TSE) | Wong Lye, BCA General Builder Class 2, Singapore
Welder on a boom lift welding the steel racking frame at height
Welder at a beam-to-column connection of the steel frame - Heavy-duty cable drum racking in a cable yard (TSE) | Wong Lye, BCA General Builder Class 2, Singapore
Welder at a beam-to-column connection of the steel frame
Red-oxide primed steel racking frame with drums on the upper tier during construction - Heavy-duty cable drum racking in a cable yard (TSE) | Wong Lye, BCA General Builder Class 2, Singapore
Red-oxide primed steel racking frame with drums on the upper tier during construction
Cable drum seated in a red-oxide primed steel rack bay, seen from below - Heavy-duty cable drum racking in a cable yard (TSE) | Wong Lye, BCA General Builder Class 2, Singapore
Cable drum seated in a red-oxide primed steel rack bay, seen from below
Multi-bay red-oxide primed steel racking structure before the drums were loaded - Heavy-duty cable drum racking in a cable yard (TSE) | Wong Lye, BCA General Builder Class 2, Singapore
Multi-bay red-oxide primed steel racking structure before the drums were loaded
Steel loading platforms with checker-plate tops outside the shed - Heavy-duty cable drum racking in a cable yard (TSE) | Wong Lye, BCA General Builder Class 2, Singapore
Steel loading platforms with checker-plate tops outside the shed
Row of steel dock platforms on yellow-marked legs in the yard - Heavy-duty cable drum racking in a cable yard (TSE) | Wong Lye, BCA General Builder Class 2, Singapore
Row of steel dock platforms on yellow-marked legs in the yard
Checker-plate surface of the steel dock platforms, cable drums in the background - Heavy-duty cable drum racking in a cable yard (TSE) | Wong Lye, BCA General Builder Class 2, Singapore
Checker-plate surface of the steel dock platforms, cable drums in the background
Steel railing at the dock edge with a safety sign fitted - Heavy-duty cable drum racking in a cable yard (TSE) | Wong Lye, BCA General Builder Class 2, Singapore
Steel railing at the dock edge with a safety sign fitted
Commercial Build · Studio fit-out · 28 photos

Music rehearsal studio fit-out with a faceted timber ceiling (Studio)

A bare industrial space turned into a rehearsal studio: insulated stud partitions, a control-room window, timber wall panels and a faceted timber ceiling with recessed lighting and speakers, shown from construction through to the finished room.

Before & after

Before: the bare industrial space with an exposed steel ceiling frame, pallets and a forklift - Music rehearsal studio fit-out with a faceted timber ceiling (Studio) | Wong Lye, BCA General Builder Class 2, Singapore
Before: the bare industrial space with an exposed steel ceiling frame, pallets and a forklift
After: the finished room with the faceted timber ceiling, red wall panels and percussion instruments - Music rehearsal studio fit-out with a faceted timber ceiling (Studio) | Wong Lye, BCA General Builder Class 2, Singapore
After: the finished room with the faceted timber ceiling, red wall panels and percussion instruments
During works: partition walls plastered and the ceiling framed, with materials stacked on the floor - Music rehearsal studio fit-out with a faceted timber ceiling (Studio) | Wong Lye, BCA General Builder Class 2, Singapore
Before During works: partition walls plastered and the ceiling framed, with materials stacked on the floor
After: timber wall panels and angled ceiling panels with downlights, before the furniture went in - Music rehearsal studio fit-out with a faceted timber ceiling (Studio) | Wong Lye, BCA General Builder Class 2, Singapore
After: timber wall panels and angled ceiling panels with downlights, before the furniture went in

Gallery

Finished rehearsal room with a faceted timber ceiling, red and grey walls, timber floor, grand piano and drums - Music rehearsal studio fit-out with a faceted timber ceiling (Studio) | Wong Lye, BCA General Builder Class 2, Singapore
Finished rehearsal room with a faceted timber ceiling, red and grey walls, timber floor, grand piano and drums
Ceiling detail - timber facets with downlights against a black-painted ceiling - Music rehearsal studio fit-out with a faceted timber ceiling (Studio) | Wong Lye, BCA General Builder Class 2, Singapore
Ceiling detail - timber facets with downlights against a black-painted ceiling
Construction: rockwool insulation packed into the stud walls, with the control-room window opening - Music rehearsal studio fit-out with a faceted timber ceiling (Studio) | Wong Lye, BCA General Builder Class 2, Singapore
Construction: rockwool insulation packed into the stud walls, with the control-room window opening
Construction: an insulated stud partition with a ladder alongside - Music rehearsal studio fit-out with a faceted timber ceiling (Studio) | Wong Lye, BCA General Builder Class 2, Singapore
Construction: an insulated stud partition with a ladder alongside
Construction: stud wall with insulation and the ceiling opening above - Music rehearsal studio fit-out with a faceted timber ceiling (Studio) | Wong Lye, BCA General Builder Class 2, Singapore
Construction: stud wall with insulation and the ceiling opening above
Close-up of rockwool insulation between the studs with cabling run through - Music rehearsal studio fit-out with a faceted timber ceiling (Studio) | Wong Lye, BCA General Builder Class 2, Singapore
Close-up of rockwool insulation between the studs with cabling run through
Corridor lined with insulated partitions, materials on the floor - Music rehearsal studio fit-out with a faceted timber ceiling (Studio) | Wong Lye, BCA General Builder Class 2, Singapore
Corridor lined with insulated partitions, materials on the floor
Insulated partitions beneath a dark ceiling during construction - Music rehearsal studio fit-out with a faceted timber ceiling (Studio) | Wong Lye, BCA General Builder Class 2, Singapore
Insulated partitions beneath a dark ceiling during construction
Painting stage - grey and red walls, ladders and the control-room window - Music rehearsal studio fit-out with a faceted timber ceiling (Studio) | Wong Lye, BCA General Builder Class 2, Singapore
Painting stage - grey and red walls, ladders and the control-room window
Black-painted ceiling with cables dropped for the speakers, curved timber panel taking shape - Music rehearsal studio fit-out with a faceted timber ceiling (Studio) | Wong Lye, BCA General Builder Class 2, Singapore
Black-painted ceiling with cables dropped for the speakers, curved timber panel taking shape
Curved timber panels and ceiling in progress, ladder in place - Music rehearsal studio fit-out with a faceted timber ceiling (Studio) | Wong Lye, BCA General Builder Class 2, Singapore
Curved timber panels and ceiling in progress, ladder in place
Angled ceiling panels being fitted around the speakers, ladder below - Music rehearsal studio fit-out with a faceted timber ceiling (Studio) | Wong Lye, BCA General Builder Class 2, Singapore
Angled ceiling panels being fitted around the speakers, ladder below
Red and green painted ceiling facets with speaker cut-outs at the plastering stage - Music rehearsal studio fit-out with a faceted timber ceiling (Studio) | Wong Lye, BCA General Builder Class 2, Singapore
Red and green painted ceiling facets with speaker cut-outs at the plastering stage
Timber wall panels installed with materials still on the floor - Music rehearsal studio fit-out with a faceted timber ceiling (Studio) | Wong Lye, BCA General Builder Class 2, Singapore
Timber wall panels installed with materials still on the floor
Timber panels and painted ceiling with the control-room window - Music rehearsal studio fit-out with a faceted timber ceiling (Studio) | Wong Lye, BCA General Builder Class 2, Singapore
Timber panels and painted ceiling with the control-room window
Room with timber panels, a scaffold and materials during fit-out - Music rehearsal studio fit-out with a faceted timber ceiling (Studio) | Wong Lye, BCA General Builder Class 2, Singapore
Room with timber panels, a scaffold and materials during fit-out
Detail of the faceted timber ceiling panels with downlights - Music rehearsal studio fit-out with a faceted timber ceiling (Studio) | Wong Lye, BCA General Builder Class 2, Singapore
Detail of the faceted timber ceiling panels with downlights
Red wall and timber panels with a ladder and materials during works - Music rehearsal studio fit-out with a faceted timber ceiling (Studio) | Wong Lye, BCA General Builder Class 2, Singapore
Red wall and timber panels with a ladder and materials during works
Timber wall panels and ceiling with recessed speakers - Music rehearsal studio fit-out with a faceted timber ceiling (Studio) | Wong Lye, BCA General Builder Class 2, Singapore
Timber wall panels and ceiling with recessed speakers
Bare space with plastered partitions and a work light - Music rehearsal studio fit-out with a faceted timber ceiling (Studio) | Wong Lye, BCA General Builder Class 2, Singapore
Bare space with plastered partitions and a work light
Plasterboard partitions in the bare space, lit by a floodlight - Music rehearsal studio fit-out with a faceted timber ceiling (Studio) | Wong Lye, BCA General Builder Class 2, Singapore
Plasterboard partitions in the bare space, lit by a floodlight
Curved timber wall panels with downlights and speakers above - Music rehearsal studio fit-out with a faceted timber ceiling (Studio) | Wong Lye, BCA General Builder Class 2, Singapore
Curved timber wall panels with downlights and speakers above
Timber wall panels with grey and red walls and a dark ceiling - Music rehearsal studio fit-out with a faceted timber ceiling (Studio) | Wong Lye, BCA General Builder Class 2, Singapore
Timber wall panels with grey and red walls and a dark ceiling
Timber panels along a wall over the bare concrete floor - Music rehearsal studio fit-out with a faceted timber ceiling (Studio) | Wong Lye, BCA General Builder Class 2, Singapore
Timber panels along a wall over the bare concrete floor
Speak to the Builder