On site now

Progress Today: Window Openings Wrapped In Plastic Sheeting Ahead Of Vinyl Flooring This Weekend, And Customer-Ordered Sanitary Ware Delivered And Inspected On Site Before Install in Tanah Merah

Job
37EW
Current stage
New toilet door hung
First update
Last update
Record
29 updates, 91 photos
Area
Tanah Merah

Builder's site log for job 37EW: dated photos from an active Wong Lye site, posted as the building work moves, newest first. For finished work, see the portfolio.

— New toilet door hung, and delivery crates on site

13 days ago 2 photos

New toilet door hung, and delivery crates on site.

New toilet door hung, and delivery crates on site – job 37EW, 6 Nov, photo 1 of 2New toilet door hung, and delivery crates on site – job 37EW, 6 Nov, photo 2 of 2

— Windows and glass panels in, and bathroom fittings going up

4 photos

Windows and glass panels in, and bathroom fittings going up.

Windows and glass panels in, and bathroom fittings going up – job 37EW, 4 Nov, photo 1 of 4Windows and glass panels in, and bathroom fittings going up – job 37EW, 4 Nov, photo 2 of 4Windows and glass panels in, and bathroom fittings going up – job 37EW, 4 Nov, photo 3 of 4Windows and glass panels in, and bathroom fittings going up – job 37EW, 4 Nov, photo 4 of 4

— Door fitted under the staircase, with a louvre vent panel

2 photos

Door fitted under the staircase, with a louvre vent panel.

Door fitted under the staircase, with a louvre vent panel – job 37EW, 28 Oct, photo 1 of 2Door fitted under the staircase, with a louvre vent panel – job 37EW, 28 Oct, photo 2 of 2

— Floor tiling and marble-look feature wall done; ceiling lights fitted along the side passage

3 photos

Floor tiling and marble-look feature wall done; ceiling lights fitted along the side passage.

Floor tiling and marble-look feature wall done; ceiling lights fitted along the side passage – job 37EW, 23 Oct, photo 1 of 3Floor tiling and marble-look feature wall done; ceiling lights fitted along the side passage – job 37EW, 23 Oct, photo 2 of 3Floor tiling and marble-look feature wall done; ceiling lights fitted along the side passage – job 37EW, 23 Oct, photo 3 of 3

— Floor tiling, painting and staircase works in progress

3 photos

Floor tiling, painting and staircase works in progress.

Floor tiling, painting and staircase works in progress – job 37EW, 22 Oct, photo 1 of 3Floor tiling, painting and staircase works in progress – job 37EW, 22 Oct, photo 2 of 3Floor tiling, painting and staircase works in progress – job 37EW, 22 Oct, photo 3 of 3

— Folding glass doors

3 photos

Folding glass doors.

Folding glass doors – job 37EW, 21 Oct, photo 1 of 3Folding glass doors – job 37EW, 21 Oct, photo 2 of 3Folding glass doors – job 37EW, 21 Oct, photo 3 of 3

— Staircase finished: wood treads on crisp white risers, black twisted iron railings and timber handrails

3 photos

37EW — Staircase finished: wood treads on crisp white risers, black twisted iron railings and timber handrails.

Staircase finished – job 37EW, 18 Oct, photo 1 of 3Staircase finished – job 37EW, 18 Oct, photo 2 of 3Staircase finished – job 37EW, 18 Oct, photo 3 of 3

— Floors uncovered and looking sharp

4 photos

37EW — Floors uncovered and looking sharp, bathroom fitted out with vanity and sanitary ware, and marble-look tiling with skirting in. Final stretch before handover.

Floors uncovered and looking sharp – job 37EW, 17 Oct, photo 1 of 4Floors uncovered and looking sharp – job 37EW, 17 Oct, photo 2 of 4Floors uncovered and looking sharp – job 37EW, 17 Oct, photo 3 of 4Floors uncovered and looking sharp – job 37EW, 17 Oct, photo 4 of 4

— Porch and soffit painted, rooms painted out and the new vinyl floors protected

5 photos

37EW — Porch and soffit painted, rooms painted out and the new vinyl floors protected. Final stretch before handover.

Porch and soffit painted, rooms painted out and the new vinyl floors protected – job 37EW, 15 Oct, photo 1 of 5Porch and soffit painted, rooms painted out and the new vinyl floors protected – job 37EW, 15 Oct, photo 2 of 5Porch and soffit painted, rooms painted out and the new vinyl floors protected – job 37EW, 15 Oct, photo 3 of 5Porch and soffit painted, rooms painted out and the new vinyl floors protected – job 37EW, 15 Oct, photo 4 of 5Porch and soffit painted, rooms painted out and the new vinyl floors protected – job 37EW, 15 Oct, photo 5 of 5

— Car porch soffit painted and new floodlights up on the eaves

3 photos

37EW — Car porch soffit painted and new floodlights up on the eaves. Gate pillar lamp fitted at the front.

Car porch soffit painted and new floodlights up on the eaves – job 37EW, 14 Oct, photo 1 of 3Car porch soffit painted and new floodlights up on the eaves – job 37EW, 14 Oct, photo 2 of 3Car porch soffit painted and new floodlights up on the eaves – job 37EW, 14 Oct, photo 3 of 3

— Ceiling boards are up across the car porch and side passage

2 photos

37EW — ceiling boards are up across the car porch and side passage, with joints and screw holes filled and wiring left ready for the lights. Ready for sanding and paint.

Ceiling boards are up across the car porch and side passage – job 37EW, 12 Oct, photo 1 of 2Ceiling boards are up across the car porch and side passage – job 37EW, 12 Oct, photo 2 of 2

— Sockets and switches going into the new cabinets

5 photos

37EW — sockets and switches going into the new cabinets, suspended ceiling framing up, drywall and corner beads closing in the rooms.

Sockets and switches going into the new cabinets – job 37EW, 8 Oct, photo 1 of 5Sockets and switches going into the new cabinets – job 37EW, 8 Oct, photo 2 of 5Sockets and switches going into the new cabinets – job 37EW, 8 Oct, photo 3 of 5Sockets and switches going into the new cabinets – job 37EW, 8 Oct, photo 4 of 5Sockets and switches going into the new cabinets – job 37EW, 8 Oct, photo 5 of 5

— Vinyl flooring delivered, roof awning fully sealed with triple layer so leakage doesn’t happen

3 photos

vinyl flooring delivered, roof awning fully sealed with triple layer so leakage doesn’t happen.

Vinyl flooring delivered, roof awning fully sealed with triple layer so leakage doesn’t happen – job 37EW, 1 Oct, photo 1 of 3Vinyl flooring delivered, roof awning fully sealed with triple layer so leakage doesn’t happen – job 37EW, 1 Oct, photo 2 of 3Vinyl flooring delivered, roof awning fully sealed with triple layer so leakage doesn’t happen – job 37EW, 1 Oct, photo 3 of 3

— Window openings wrapped in plastic sheeting ahead of vinyl flooring this weekend

2 photos

37EW progress today: window openings wrapped in plastic sheeting ahead of vinyl flooring this weekend, and customer-ordered sanitary ware delivered and inspected on site before install.

Window openings wrapped in plastic sheeting ahead of vinyl flooring this weekend – job 37EW, 29 Sep, photo 1 of 2Window openings wrapped in plastic sheeting ahead of vinyl flooring this weekend – job 37EW, 29 Sep, photo 2 of 2

— Carpentry is in

1 photo

Carpentry is in at 37EW. The cabinet carcasses and island base are on site and being fitted, with the floor still covered for protection.

Carpentry is in – job 37EW, 22 Sep

— Carpentry is in

1 photo

Carpentry is in at 37EW. The cabinet carcasses are on site and being fitted, with the floor still covered for protection. We are moving into the final lap of this job.

Carpentry is in – job 37EW, 17 Sep

— Interior painting has started

2 photos

Interior painting has started at 37EW. The staircase walls are coated and the handrail and balustrade are wrapped and taped before the next stage. In the toilet the tiling is done and the WC is in, covered up while the painting work goes on.

Interior painting has started – job 37EW, 15 Sep, photo 1 of 2Interior painting has started – job 37EW, 15 Sep, photo 2 of 2

— Sliding gate is up

4 photos

Sliding gate is up at 37EW. The frame was welded on site before it went on. Solar is in as well, lifted up to the roof by crane. Toilets and shower sets are installed in both bathrooms. Moving closer to completion.

Sliding gate is up – job 37EW, 3 Sep, photo 1 of 4Sliding gate is up – job 37EW, 3 Sep, photo 2 of 4Sliding gate is up – job 37EW, 3 Sep, photo 3 of 4Sliding gate is up – job 37EW, 3 Sep, photo 4 of 4

— Painting has started

5 photos

Painting has started at 37EW. The ceilings inside and the external walls now have their coat on, scaffold still up. Solar panels go in next week. Four months in, and the long wait now is carpentry and windows.

Painting has started – job 37EW, 29 Aug, photo 1 of 5Painting has started – job 37EW, 29 Aug, photo 2 of 5Painting has started – job 37EW, 29 Aug, photo 3 of 5Painting has started – job 37EW, 29 Aug, photo 4 of 5Painting has started – job 37EW, 29 Aug, photo 5 of 5

— Rear courtyard tiling

1 photo

Rear courtyard tiling at 37EW. Large-format grey tiles laid right across the yard. The access covers are cut in so the grout lines carry straight through them. Work around the courtyard is still going on.

Rear courtyard tiling – job 37EW, 27 Aug

— Exterior flooring is about 90% done

5 photos

Exterior flooring at 37EW is about 90% done. The last tiles are down with the levelling clips still on. Inside we have started the self-levelling screed, ready for vinyl flooring.

Exterior flooring is about 90% done – job 37EW, 18 Aug, photo 1 of 5Exterior flooring is about 90% done – job 37EW, 18 Aug, photo 2 of 5Exterior flooring is about 90% done – job 37EW, 18 Aug, photo 3 of 5Exterior flooring is about 90% done – job 37EW, 18 Aug, photo 4 of 5Exterior flooring is about 90% done – job 37EW, 18 Aug, photo 5 of 5

— Planning stage for a solar PV system

1 photo

Planning stage for a solar PV system. This is the roof plan showing where the panels will sit. Layout is set out before any install work starts.

Planning stage for a solar PV system – job 37EW, 15 Aug

— Laying floor tiles across the courtyard on this A&A job

2 photos

Laying floor tiles across the courtyard on this A&A job. Every gradient is measured so water runs off the way it should. Screed bed goes down first, then the tiles follow the fall. Working doubly hard to keep on schedule.

Laying floor tiles across the courtyard on this A&A job – job 37EW, 13 Aug, photo 1 of 2Laying floor tiles across the courtyard on this A&A job – job 37EW, 13 Aug, photo 2 of 2

— Internal level 1 tiling is nearly done

3 photos

Internal level 1 tiling is nearly done. Large format tiles laid with levelling clips to keep them flat. Now we move to the external works, rendering and waterproofing the structure at the front. Job at 37EW

Internal level 1 tiling is nearly done – job 37EW, 13 Aug, photo 1 of 3Internal level 1 tiling is nearly done – job 37EW, 13 Aug, photo 2 of 3Internal level 1 tiling is nearly done – job 37EW, 13 Aug, photo 3 of 3

— Laying the floor tiles in this courtyard

1 photo

Laying the floor tiles in this courtyard. Big-format tiles with levelling clips to keep them flat. Left the openings for the services and finishing the rest this week.

Laying the floor tiles in this courtyard – job 37EW, 13 Aug

— Exterior tiling works

1 photo

Exterior tiling works, job 37EW. Large tiles laid out with levelling clips to hold the gradient and keep the alignment matched across the floor. Working on it every day to get it finished. Levels checked as we go.

Exterior tiling works – job 37EW, 8 Aug

— Work in progress on this house

6 photos

Work in progress on this house. Walls plastered, bathroom tiling going in with levelling clips still on, and the staircase balustrade set. Floor is almost ready for screed to level up before finishing and paint works.

Work in progress on this house – job 37EW, 29 Jul, photo 1 of 6Work in progress on this house – job 37EW, 29 Jul, photo 2 of 6Work in progress on this house – job 37EW, 29 Jul, photo 3 of 6Work in progress on this house – job 37EW, 29 Jul, photo 4 of 6Work in progress on this house – job 37EW, 29 Jul, photo 5 of 6Work in progress on this house – job 37EW, 29 Jul, photo 6 of 6

— Renovation works on a 3-storey semi-detached house

5 photos

Renovation works on a 3-storey semi-detached house. Over three months of masonry, partition, electrical and plumbing work. Here you can see the ceiling being built up and the floor tiling going in with levelling clips still on. Job is running well and we may finish before the November 2026 completion date. — Larry @larryhoo89

Renovation works on a 3-storey semi-detached house – job 37EW, 26 Jul, photo 1 of 5Renovation works on a 3-storey semi-detached house – job 37EW, 26 Jul, photo 2 of 5Renovation works on a 3-storey semi-detached house – job 37EW, 26 Jul, photo 3 of 5Renovation works on a 3-storey semi-detached house – job 37EW, 26 Jul, photo 4 of 5Renovation works on a 3-storey semi-detached house – job 37EW, 26 Jul, photo 5 of 5

— Work in progress

9 photos

Work in progress on job 37EW. We are forming the window and door openings and smoothing the wall around them ready for installation. Same job we are laying the floor tiles, set out with levelling clips before grouting. Wiring is still run loose while the rooms are being finished.

Work in progress – job 37EW, 22 Jul, photo 1 of 9Work in progress – job 37EW, 22 Jul, photo 2 of 9Work in progress – job 37EW, 22 Jul, photo 3 of 9Work in progress – job 37EW, 22 Jul, photo 4 of 9Work in progress – job 37EW, 22 Jul, photo 5 of 9Work in progress – job 37EW, 22 Jul, photo 6 of 9Work in progress – job 37EW, 22 Jul, photo 7 of 9Work in progress – job 37EW, 22 Jul, photo 8 of 9Work in progress – job 37EW, 22 Jul, photo 9 of 9

Want work like this on your place?

Speak to the Builder
Speak to the Builder