Do you carry out A&A works in Yishun?
Yes. Wong Lye works in every district in Singapore except Sentosa, with our own team and subcontractors we have used for years. Yishun is within that coverage, and being further from our base does not change the quotation — the cost is driven by the condition of the existing house, how much you are adding, site access and finishing standard.
What can I actually build on my plot in Yishun?
That is decided plot by plot, not estate by estate. URA sets the building envelope, setbacks from each boundary, and the number of storeys for your specific property, and some plots sit inside Good Class Bungalow or conservation boundaries with tighter rules again. Two houses on the same road can differ. We pull your property's actual URA records before quoting rather than assuming what a neighbour did is permitted — sometimes that tells us straight away an idea will not be approved, which is better learned before you pay anyone to draw it.
My neighbour did a similar extension. Can I do the same?
Not necessarily, and it is the most expensive assumption in landed renovation. Their plot may have a different envelope, their approval may pre-date a rules change, or the work may simply never have been approved. We check yours specifically.
Can the existing house take another storey?
For anything built before about 1990 we do a foundation review and a column and beam load calculation before quoting. Older landed houses were not designed for today's loads — an added storey, heavier finishes, solar panels. Sometimes the answer is reinforcement first; occasionally the honest answer is that rebuilding costs less than propping up what is there. The check costs you nothing; it is part of how we quote.
Who handles the URA and BCA submissions?
We do, as part of the build. An Architect and a Qualified Person handle the design and the certification that has to be signed. Larry Hoo, the Director, is the builder and is on site — he is not the engineer, and does not pretend to be.
What warranty do I get on a Yishun project?
On a landed home, seven years from handover on everything we build — structural, plumbing, masonry, partitions and windows — and it follows the house, so if you sell, the buyer inherits the balance. Painting is quoted at five years because that is Nippon's own warranty on the product and we will not promise longer than the maker will. There is no inspection fee during the period: send a photo or video, or we send someone, and a small issue is settled at no charge.
How long does an A&A or rebuild take?
A focused A&A typically runs 6 to 12 months; a full reconstruction 12 to 18. Submissions alone can take 2 to 4 months before any physical work starts, and we build that into the timeline upfront rather than surprising you with it later.