What Goes Under a Steel Mezzanine: Where the Columns Land and What the Floor Below Still Has to Do
Pictured above: a steel mezzanine in a factory unit from our project archive, seen from the floor below. The platform is the part everyone draws. The white column at the corner of the staircase, the lights fixed under the deck and the yellow barriers standing on the floor are the parts the floor below has to live with.
When an owner asks for a mezzanine, the conversation is about the new floor on top: how much extra area, what it will carry, how people get up. That is reasonable, but the money in an industrial unit is usually made on the ground floor, where the stock sits, the goods are packed and the forklifts move. A mezzanine puts a deck over that floor, drops columns into it and hangs a ceiling over everything that used to have the unit's roof above it.
This is about what the floor below still has to do once the platform is above it. The question behind it is the one owners actually type: what happens to the space under a steel mezzanine in an industrial unit in Singapore? It follows our pieces on floor loading and submissions, the deck surface and the staircase and access, which deal with the top and the way up.
Columns are what the floor below pays for
A deck cannot float. It stands on columns, and every column lands on your ground floor, where it takes up space and sits in the way of something. In the photo above, one boxed column stands at the corner of the staircase, and the stair itself takes floor area below as well as above.
There is a trade-off in the structure that the owner should know about. Fewer columns means longer spans between them, and longer spans need deeper beams, which hang lower and cost headroom. More columns keep the beams shallow but put more obstacles on the floor. Neither answer is wrong. The right one depends on how you use the floor below, which is why the layout of the floor below has to be on the table before the structure is drawn.
Ask for the column positions to be drawn on a plan of your existing floor, with the things that matter overlaid on it: racking positions, aisles, work benches, the path of the largest forklift or pallet truck you use and the space it needs to turn. If a column lands in an aisle or on a turning path, move the column on paper now, not the racking after the steel is up.
Headroom is measured at the lowest thing, not at the deck
The clear height under a mezzanine is not the height to the underside of the deck. Beams hang below the deck, and ducts, light fittings and pipes hang below the beams. The number that matters is the clear height at the lowest point, over the aisles and work areas where the tallest thing you will store or drive has to pass.
Decide that number before the design, and ask for it as a figure on the drawing at its lowest point. Ask what the building rules require as a clear height for the way the space will be used, and have the Qualified Person (QP) confirm it in writing. Do not accept a general statement that headroom is “enough for forklifts”; forklifts, mast heights and loads differ, and so do the things you store.
The lights above you are now above the deck
The existing lights in a unit hang from the roof. Put a deck under them and the floor below is in shade. In the photo, you can see lights fixed under the deck and across the floor below, which is what a finished job looks like. Someone had to plan those: where the new fittings go, what circuits feed them, and how the cables reach them.
Ask the quotation to say whether the lighting under the deck is included, who installs it and who connects it. Ask the same about the sockets, switches and data points the floor below will need. If it is not in the quote, it is a separate cost that arrives after the steel is built.
Sprinklers, detectors and exit signs
A deck over a floor can sit between that floor and fire protection that was designed for the unit as it was. Sprinkler heads, smoke detectors and emergency or exit lighting may need to be moved, added or protected, so that the floor below and the platform above are each covered. That is not a decision for the person erecting the steel. It goes to the QP and, where the building has one, the fire consultant, and the answer should be in writing before the layout is fixed. Exit signs, like the one visible at the right edge of the photo, must stay visible and the routes to them must stay clear; check that the platform and its staircase do not interrupt either. Our piece on fire protection for structural steel covers the steel side of the same conversation.
Ducts, fans and pipes that cross the footprint
Walk the footprint of the planned mezzanine and look up. In the photo, ducting and pipework run across the ceiling above the deck. Anything that crosses the footprint is either in the way of the deck or hidden by it, and both are problems: something may have to be moved, or someone has to be able to reach it later. Mark every duct, pipe, fan and cable tray on the plan, and ask for each one to be dealt with in the quotation, with access left where it is needed. If an air-conditioning or ventilation system serves the floor below, ask who has checked that it still works with a deck over part of the space.
Protect the structure from the traffic below
A column in a working aisle gets hit eventually. The photo shows yellow barriers standing on the floor below, and that is the kind of thing worth deciding at design stage: which columns need protection, which stair feet need a barrier, and whether the barriers are fixed to the slab. A barrier that is added after a collision is a more expensive way to find out. Ask what protection is included, and what it is fixed to.
Do not forget the slab
Each column puts a concentrated load onto your ground floor. Whether the slab can take it is covered in our floor-loading guide, and it is the first question the engineer should answer, before the layout questions above are fixed.
If the unit has to keep working while it is built
Most of our mezzanines go into units that stay open. That makes the floor below a working area during construction, with the sequence, deliveries and hot work all part of the planning. The way to deal with it is set out in steel works inside a working warehouse.
Questions to put to every quotation
- Is there a plan showing every column on the existing floor, with racking, aisles and forklift paths overlaid?
- What is the clear height at the lowest point under the deck, and who has confirmed it meets what the building needs?
- Is the lighting for the floor below included, and the power and data that go with it?
- Who has checked the sprinklers, detectors and exit signs against the deck, and is the answer in writing?
- What happens to ducts, pipes and fans that cross the footprint?
- What protects the columns and the foot of the stair from traffic, and what is it fixed to?
The short version
- The platform is the part you see; the columns, headroom, lights, sprinklers and ducts are what the floor below pays for.
- Draw the columns on your real floor plan with the aisles and forklift paths before the structure is fixed.
- Get the clear height as a figure, at the lowest point, not at the deck.
- Ask whether lighting and power under the deck are in the quotation.
- Put sprinklers, detectors and exit signs to the QP in writing.
- Decide the column and stair-foot protection at design stage.
If you are planning a mezzanine and want the floor below looked at before the structure is drawn, WhatsApp us on 9107 2601. Send us the unit, the building and how the floor below is used, and we will tell you what the layout is missing. Wong Lye Pte Ltd holds a BCA General Builder Class 2 (GB2) licence and works on industrial, commercial and landed construction across Singapore. See our commercial and warehouse work.