Door Under the Staircase in a Landed House in Singapore: What the Space Behind It Needs Before the Door Goes On
Pictured above: the door under the staircase on one of our landed A&A jobs, 37EW, with a louvre vent panel set into the bottom of the door leaf. The door is in its frame, the surrounding wall is painted and the protective tape is still on the frame.
In most two- and three-storey landed houses there is a triangle of space under the staircase. Owners notice it late. The stair is built, the walls are painted, and someone asks what the gap under the flight is going to be. The usual answer is a store: shoes, a vacuum cleaner, luggage, the Christmas box, the tools nobody wants in the kitchen. Then a door goes on it, and the question that decides whether the cupboard is good or merely closed comes up too late. What does the space behind that door need?
This article is about that one door and the space behind it. It is the small decision that gets made in the last weeks of a landed A&A, usually between the carpenter and the owner, and often with no one from the structural side in the conversation. On 37EW the update posted on 28 October records exactly this: a door fitted under the staircase, with a louvre vent panel. The staircase itself had been finished ten days earlier, with wood treads on white risers, black iron railings and timber handrails, and in the photo of the door the marble-look floor is already laid and covered. That order matters, and we come back to it below.
Start with what the space is
The space under a stair is not an empty room. It is bounded on top by the underside of the flight, which on a landed house is part of the structure, and it has whatever the original design and the services put in or near it. Before anyone draws a door, find out three things.
- What is the sloped ceiling made of? If the flight is a concrete stair, the underside is structure and nothing should be cut, chased or fixed into it without the engineer's agreement. If it is a steel or timber stair, ask what the finish under it is meant to be and who is protecting it. Our post on a floating staircase in your own landed house covers why a stair is more than furniture.
- Does anything run through the space? A pipe, a cable, a distribution board, a water meter or a box that has to be opened later. Whatever is in there has to stay reachable, so tell the builder what you can see before the carpenter makes anything fit around it. A cupboard that hides a service you will need to get at in two years is a bad cupboard.
- How high is the opening where it meets the floor? The flight slopes, so the clear height is greatest at one end and zero at the other. The door goes where a person can stand up and use it, and the shelves go where the slope leaves room. Measure on the real floor, not on the drawing, because the floor finish changes the number.
Why the door is not just a door
Singapore is humid all year, and a small closed cupboard with no way for air to move tends to smell musty. Shoes, umbrellas, bags and cleaning tools that go in slightly damp stay damp. A louvre panel in the door, as on 37EW, or a vent at the bottom or the top of the cupboard, lets some air move so the space does not sit shut and stale. It is an easy thing to include when the door is ordered and an awkward thing to add afterwards, because a hole cut in a finished veneered door leaf shows.
We are not saying a vent solves damp. It does not. If the wall behind the cupboard is wet, the vent will not fix the wall; that is a waterproofing question, covered in where waterproofing fails on a landed home. What the vent does is stop a dry cupboard turning into a stale one. Decide whether you want it before the door is made.
What to settle before the door is ordered
- Which way does it swing? A door that opens onto a passage can block the passage. A door that opens inward can hit the shelves. Mark the swing on the floor with tape and open an imaginary door before you agree the hinge side.
- Does it match the other doors? The door under the stair is usually in plain view from the hallway or living area. If every other door in the house has a certain grain, colour and handle, this one should too. On 37EW the leaf has its own handle and a louvre panel set low in the leaf.
- Where does the vent go and how big is it? Low in the door is common, and the louvre should be fixed so it cannot rattle or drop out. Ask what the vent is made of and whether it is a separate piece or part of the leaf.
- Where is the threshold? If the tile floor runs through the doorway, the door must clear it. If the tile stops at the frame, the edge needs to be finished neatly. A door fitted before the floor, or a floor laid with no allowance for the door, are both common reasons for a gap at the bottom or a door that scrapes.
- What is inside? A cupboard for shoes needs ventilation and a floor that can take wet soles. A cupboard for a vacuum needs a socket. A cupboard for tools needs a shelf that holds weight. Write down what it will store before the carpenter builds anything inside.
- Is there a light or a socket? If you want one, it has to be planned before the walls close, because the cable is chased into the wall before painting. The same logic is in getting the services done before the walls close.
The order of work matters more than the door
Doors are one of the last things to go in, because they are exposed: a hinge, a handle and a veneered face all mark easily. On 37EW the sequence was the staircase finished on 18 October, the floor tiling and the marble-look feature wall done in the update of 23 October, and the under-stair door on 28 October. The same pattern is in our post on the finishing stage of a landed A&A: the wet trades first, then paint, then the floor, then the joinery and the doors.
That leaves the door to be fitted into a finished room, and a finished room is easy to damage. Ask who protects the floor and the frame while the door is being hung, and who touches up the paint beside the frame afterwards. The photo above shows the tape still on the door frame, which is how it should look on the day it is hung. Who pays when a finished floor or a fitted door is marked is covered in who is responsible for scratched floors and chipped fittings.
What tends to go wrong
- The door is made before the floor is laid, and the finished floor is higher than expected, so the door scrapes or the gap below it shows.
- The cupboard has no air at all, and in a few months it smells.
- Something in the space has to be reached and the carpenter has built it in.
- The door swing clashes with a wall, a shelf or the person standing in the hall.
- The sloped ceiling is cut or fixed into without anyone asking whether it is part of the stair structure.
None of these is hard to avoid. Each needs a short conversation at the right time, with the carpenter, the person managing the job and, if the stair is structural, the engineer in the room.
Questions to ask before the door is ordered
- What is the underside of the stair, and may anything be fixed to it?
- Does any pipe, cable, board or meter run through this space, and how will it stay reachable?
- Which way does the door swing and does it clear the passage?
- Will the door match the other doors in colour, grain and handle?
- Is there a vent, where is it, and what is it made of?
- What is the floor finish at the threshold and has the door height allowed for it?
- What will be stored inside, and does it need a socket, a light or a shelf?
- Who protects the floor and the frame when the door is hung, and who touches up the paint?
The short version
- The space under a stair is bounded by structure. Find out what the underside is, and what runs through the space, before anything is built.
- A closed cupboard in a humid house goes stale. Decide on a vent before the door is ordered.
- Settle the swing, the match to other doors and the threshold on paper first.
- The door goes in near the end of the job. Agree who protects the floor and the frame while it is hung.
If you are planning the last stages of a landed A&A, see our A&A works page for how the work is staged.
If you are partway through an A&A and want to check the space under your staircase before the joinery goes in, WhatsApp us on 9107 2601. Tell us the house and where the job is up to, and we will tell you what to look at first. Wong Lye Pte Ltd holds a BCA General Builder Class 2 (GB2) licence.
Related: if anything is plugged in or switched on inside the cupboard, settle its position first. Sockets and switches inside built-in cabinets explains how.