Dividing an Open Industrial Unit Into Rooms: What Each Partition Wall Has to Do Before You Decide Where It Goes
You lease a big, open industrial unit. High ceiling, bare slab, a roller shutter at the front. Then the list arrives: an office, a pantry, a meeting room, a store, perhaps a small cold room or a quiet corner for calls. Every one of those is a wall, and the first instinct is to treat "partition" as one item with one price. It is not. A partition that only has to hide a store from view and a partition that has to keep a meeting room quiet are different walls, built differently, and the quotation should say which is which.
Pictured above: the inside of a stud partition from one of our own commercial fit-outs, from our rehearsal studio project — rockwool packed between the studs and cable already run through, before any board went on. That stage is the one most people never see, and it is the one the rest of this article keeps coming back to.
First, say what each wall is for
Before anyone draws a line on the floor plan, give each new wall one job, in plain words. The usual jobs are:
- Visual separation. The store behind the office should not be the first thing a visitor sees. A light wall is enough.
- Sound. A meeting room or a call corner next to a forklift aisle needs a wall that is built to stop sound, which means insulation in the cavity, no gaps, and a proper door. A wall that merely looks solid does not do it.
- Security. A store for high-value stock needs a wall and a door that cannot be walked through, and that is a different specification from a pantry wall.
- Temperature. A room that will be air-conditioned while the unit around it is not is a sealed box, and the wall has to be built as one.
- Fire and escape. New rooms can change how people leave the unit and what the existing sprinklers and detectors cover. That is not a builder's guess; it goes to the Qualified Person (QP) and, if your unit has one, the fire consultant, in writing.
A wall with two jobs, say sound and security, is built differently from a wall with one, so it should not be priced like one. Ask for each wall to be listed with its job next to it.
Where the wall stops is a decision, not a detail
In an office, partitions stop at a ceiling grid and everyone moves on. In an industrial unit the real ceiling may be a long way above, with steel framing and roof sheeting in between. You have three honest options, and each one has a consequence:
- Stop at a new ceiling. Cheaper and quicker, and the void above the ceiling stays open between rooms. Sound, smell and dust all travel across it. Fine for a store and an office; poor for a meeting room.
- Run the wall up to the structure above. This closes the void and is the right answer where sound or security matters. It means a tall wall, so it needs more framing and more bracing than a standard height, and the top has to be fixed to something that can take it.
- Use a mix. Full-height walls for the rooms that need them, a ceiling for the rest.
That last phrase, "fixed to something that can take it", is where industrial units catch people out. Roof sheeting and light purlins are often designed to keep rain out and carry their own weight and little else. They may not have been designed to be the anchor for a tall wall, a row of hanging services or a heavy ceiling. Before anything is fixed upward, ask who has checked what the roof frame can carry, and ask for that answer from the engineer, not as a verbal "should be fine".
Light walls and heavy walls are a different conversation
A metal-stud wall with board on both sides is light, quick and can be taken out again. A block or brick wall is heavy, slower and effectively permanent. Neither is wrong; they suit different jobs.
- The floor. A heavy wall puts a line load on the slab. On a ground-floor slab that is usually unremarkable. On an upper-floor unit, or where the slab carries racking or forklift traffic, it is a question for the engineer before the wall is priced. The same logic is set out in our piece on floor loading in an industrial unit.
- Lease end. A stud partition can usually be taken out and the floor patched. A block wall leaves a bigger problem. If the lease says the unit goes back as you found it, build with that in mind.
- Doors. Heavy trolleys, pallet jacks and equipment pass through doorways in an industrial unit. Decide the widest and tallest thing that has to go through each door before the frame is ordered, not after.
The stage nobody sees: services inside the wall
Power, data, air-conditioning pipework and lighting circuits all need to reach the new rooms, and most of them run inside or above the new walls. The sequence that works is simple and it is the one in the photo at the top of this article:
- The stud frame goes up.
- Insulation goes into the cavity where sound matters.
- The cable and conduit routes are run.
- Someone photographs every wall with the routes visible, and the electrician marks which circuit is which.
- Only then does the board go on.
Step 4 costs very little at the time and is worth a great deal later, when you need to add a socket or find a fault and have to know where the cable runs without cutting the wall open. Ask for those photos as part of handover. It is also the moment to settle where anything heavy will be mounted on the wall, such as shelving, a screen or a wall-mounted air-conditioner, so that the studs or backing behind the board are in the right place before they are hidden. The same before-the-walls-close discipline on a house is covered in rewiring and services before the walls close.
Check the unit before you agree to the layout
A layout drawn on a bare floor plan can run into things the plan does not show:
- Existing columns, which are usually in the way of a neat room.
- Sprinkler heads, detectors, lighting and ducting at ceiling level, which a new full-height wall will cut across.
- Floor drains, trenches and level changes in the slab.
- Landlord rules on what you may fix to the structure, which walls you may build and who must approve. These come first; the sequence is in our guide to altering a leased industrial unit.
Walk the unit with whoever is going to build it, look up as well as down, and mark every one of these on the plan before the layout is final.
Agree reinstatement before the first stud goes up
The lease usually says what condition the unit must be returned in. Read that clause before the layout is fixed, not when the lease is ending. Then ask the builder to note, wall by wall, what comes out easily, what leaves marks on the slab and what will need patching. A stud-and-board layout that was built with removal in mind costs far less to undo than one that was not, and it is a cheaper conversation to have now than later. If you are also putting a mezzanine or a studio-type room in, those have their own removal questions, which are dealt with in the articles linked above.
Questions to put to every quotation
- What is each wall for, and what is it built from to do that job?
- Does each wall stop at a ceiling or run to the structure, and what is it fixed to at the top?
- Who has checked what the roof frame and the floor slab can carry?
- Where do cable, conduit and pipe routes run, and will they be photographed before the board is fixed?
- How wide and tall are the door openings, and what has to pass through them?
- Who is dealing with the sprinklers, detection and escape routes, and is the answer in writing?
- What does the lease require at the end, and what will removal involve for each wall?
The short version
- Give every wall one job and price each wall for that job.
- Decide whether each wall stops at a ceiling or runs to the structure.
- Do not fix tall walls or hanging loads to the roof frame until an engineer has said it can take them.
- Check the floor for heavy walls, and size the doors to what has to go through them.
- Photograph the services inside the walls before the boards close.
- Settle fire, sprinklers and escape routes through the QP, in writing.
- Read the lease's reinstatement clause before the layout is final.
If you are dividing up an industrial or commercial unit, WhatsApp us on 9107 2601. Tell us the building, the floor the unit is on, the rooms you need and what the lease says about reinstatement, and we will tell you what needs checking first and what the building work would involve. Wong Lye Pte Ltd holds a BCA General Builder Class 2 (GB2) licence and works on industrial, commercial and landed construction across Singapore. See our commercial and warehouse work.
Also worth reading: once the walls are decided, the ceiling above them has its own order of work: Building a Feature Ceiling Inside an Industrial Unit: The Order of Work, the Cut-Outs and Why the Cables Hang Down for Weeks.