Aquarium, Home Gym or Library Upstairs in a Landed House: What the Floor Was Built to Carry

Aquarium, Home Gym or Library Upstairs in a Landed House: What the Floor Was Built to Carry

Pictured above: a steel loft platform over an office room, from one of our metal-works projects. It is a commercial unit, not a house, shown only because it makes the point of this article: a floor above head height is a structure, and the frame underneath it, not the finish on top, decides what it can carry.

It usually comes up after the plans are drawn. The designer has put a 1,000-litre aquarium on the second-floor landing, or the owner wants the spare bedroom to become a home gym, or a whole wall of the study is to be floor-to-ceiling bookshelves. Somebody asks, almost as an afterthought, "the floor can take that, right?" And everybody in the room nods, because nobody in the room knows.

This is a note on how to find out before the item is bought and the carpentry is built around it. The question behind it is the one owners actually ask: can the upper floor of my landed house take a fish tank, a home gym or a library?

A floor is built for a use, not for "anything"

A floor in a landed house is designed by an engineer for a particular use. A bedroom floor is designed as a bedroom floor: people, beds, wardrobes, the ordinary furniture of a bedroom. It is not designed as a gym, a library or a room with a tank of water in it, because nobody told the engineer it would be one.

That is not a defect. The design assumption is normally written on the structural drawings, and the floor is built to it. The trouble starts when the use changes later and nobody goes back to the drawings. Neither the interior designer's layout nor the carpenter's shop drawing is a structural check. They show where things go, not whether the floor underneath can take them.

A second point catches people out. A floor is not one thing. It is a slab that spans between beams and walls, and the beams are carried by columns. A heavy item placed right over a beam or against a supporting wall is a very different load from the same item standing in the middle of a span. Where the item sits matters as much as how much it weighs.

The things that actually catch people out

  • An aquarium. One litre of water weighs about one kilogram, so a 1,000-litre tank holds about a tonne of water before you add the glass, the stand, the substrate and the rock. And it all stands on a small footprint. The same tonne spread across a whole room would be nothing; sitting on one spot it is a concentrated load. Then there is the other risk: a tank that leaks or is drained onto a floor with no waterproofing is a waterproofing problem on the storey below, not just a wet carpet.
  • A home gym. It is the weight of the rack and plates, but also what happens during use: weights being set down hard, a barbell dropped, a person jumping. Upper floors feel that more than a ground floor does. A ground floor that sits on the earth is the easiest place for a gym. If it has to be upstairs, it usually belongs against a supporting wall or over a beam, not mid-span.
  • A library or a wall of shelves. Paper is heavy. A full wall of books is a long line of load along one edge of the room, which is better if that edge sits over a wall or beam and worse if it does not. Built-in cabinetry in solid material adds permanent weight on top of what goes in it.
  • A safe, a stone slab or a freestanding stone bath. A big safe is a point load. Thick natural stone for the floor, with the screed under it, is a permanent addition. A stone bath, once it is filled and someone is in it, weighs far more than the empty tub the supplier quoted. All three are the kind of purchase that arrives before anyone has asked the structure.
  • Planters and roof gardens. Wet soil weighs far more than dry soil, and the weight you plan for is the wet one after a week of rain. This is why a terrace or roof garden is a structural question, which we covered in building a roof terrace on a landed house.

Old houses: the drawings may not be the whole story

This is where our own checking starts, so we will be plain about it. On our A&A page we say that for homes built before 1990 we always do a foundation review and a column and beam load calculation before quoting, because older landed homes were often built to standards that do not accommodate today's heavier loads, whether that is an extra storey, heavier finishes or solar panels. A tank, a gym and a stone floor belong in the same list.

Many landed houses have reinforced concrete upper floors, but not all of them do, and a house that has been extended or altered over the decades may not be one structure but several of different ages. Do not assume that the floor you are standing on is the floor in the original drawings. Which is why the first step is not to buy the item. The first step is to find out what you have.

What to do before you buy it

  1. Say what it is, where it goes and how heavy it is when ready for use. For a tank, that is the filled weight including stand and contents. For a gym, the total of the equipment and what use it will take. For shelves, the length of wall and the material.
  2. Find whatever drawings exist. The structural drawings from the original build or from any earlier A&A may be with the previous owner, the earlier builder or your Qualified Person. They are where the floor's design use is written down.
  3. Ask your QP or structural engineer to check the floor for that item in that place. Say the exact spot. Moving a tank by a metre, to line up with a beam or wall, can turn a "no" into a "yes".
  4. Treat the answer as one of three. It is fine where it is; it is fine if it moves or is spread out; or the floor needs strengthening first. All three are normal answers.
  5. Do the strengthening before the item arrives. The options run from moving the item, to spreading its load with a platform, to adding structure under the floor. Added steel is something we fabricate ourselves, but which of these it is for your house is for the engineer to say.

When it stops being furniture

There is a line between placing something on a floor and altering the floor. If the plan is to set the tank into the slab, sink a bath, cut an opening for a staircase or void, or hack into a beam to run a pipe, you are no longer talking about furniture. That is structural alteration, and it belongs with your QP from the first day, not with the carpenter. For structure that is being added rather than loaded, see internal lofts and mezzanines in a landed house and attic conversions.

The same applies the other way around. If you have already moved a heavy item in and the floor is showing hairline cracks along one line, a noticeable sag, or doors that now stick, stop adding to it and read when a crack in a landed house needs an engineer. Cracks do not always mean structure, and they do not always mean nothing, which is exactly the judgement the engineer is for.

Questions to put to your designer or builder

  1. Has anyone checked the structure under this item, or has only the layout been drawn?
  2. What is the item's weight when filled, loaded or in use, not the weight on the supplier's sheet?
  3. Where exactly does it sit against the beams and walls below?
  4. If the answer is "it needs strengthening", is that priced as its own line, and who designs it?
  5. If water is involved, what waterproofing is under it and what happens to the storey below if it leaks?

The short version

  • A floor is designed for a use. A tank, a gym or a library is a different use, and the layout drawing does not check it.
  • Where the item stands matters as much as what it weighs: over a beam or against a wall beats mid-span.
  • Count the weight when it is filled, loaded or in use.
  • Older houses may not match their drawings. Find out what you have before you buy.
  • Ask your QP or structural engineer about the exact spot. The answer is yes, yes if it moves, or strengthen first.
  • If the plan cuts into the slab or a beam, it is structural work from day one.

Planning something heavy for an upper floor and want to know what the structure can take before you commit? WhatsApp us on 9107 2601 with the house and what you want to put where, and we will tell you what needs checking first. Wong Lye Pte Ltd holds a BCA General Builder Class 2 (GB2) licence and builds A&A works, extensions and reconstructions on landed homes. See A&A works for landed homes.

Related reading: a swimming pool on a landed house: what the structure has to do · large-format floor tiles: what the floor underneath must be first · waterproofing failure points on landed homes

Live jobs

Common questions
Can the upper floor of my landed house take a fish tank, a home gym or a library?
It depends on what the floor was designed for and where the item stands. A floor is designed by an engineer for a particular use, usually noted on the structural drawings, and a large tank, a gym or a wall of books is a different use. A heavy item placed over a beam or against a supporting wall is a very different load from the same item in the middle of a span. Ask your Qualified Person or structural engineer to check the exact item in the exact spot before you buy it.
How heavy is a 1,000-litre aquarium?
One litre of water weighs about one kilogram, so 1,000 litres of water is about a tonne before you add the glass, the stand, the substrate and the rock. It also stands on a small footprint, so it is a concentrated load. Use the filled weight, not the empty weight on the supplier's sheet, and ask what waterproofing is under it, because a leak lands on the storey below.
Is a home gym better on the ground floor or an upper floor?
A ground floor that sits on the earth is the easiest place for a gym, because upper floors feel dropped weights and bouncing more. If it has to go upstairs, it usually belongs against a supporting wall or over a beam rather than in the middle of a span, and the floor should be checked for that use first.
How do I find out what my floor was built to carry?
Start with whatever drawings exist: the structural drawings from the original build or any earlier A&A, which may be with the previous owner, an earlier builder or your Qualified Person. Then ask your QP or structural engineer to check the floor for your item in its exact position. The answer is usually one of three: fine where it is, fine if it moves or is spread out, or the floor needs strengthening first.
When does putting something heavy in a room become structural work?
When the plan cuts into the structure: setting a tank into the slab, sinking a bath, cutting an opening in a floor, or hacking into a beam to run a pipe. That is structural alteration and belongs with your Qualified Person from the first day, not with the carpenter. Placing furniture on a floor that has been checked is not.
← Back to Journal

Have a Question We Haven't Answered Yet?

Most of our articles start as questions from WhatsApp conversations. If there's something you wish a builder would explain honestly, send it to us.

Send Us a Question →
WhatsApp · Direct line to the builder
Speak to the Builder