A Floating Staircase in Your Own Landed House: What BCA Leaves to You and What to Write Into the Quotation
Pictured above: the staircase in one of our completed projects, an office loft (HomeOffice) rather than a house. The timber treads come out of a single steel spine, with a black steel balustrade and timber handrail beside them and the mesh railing of the loft above. This is the construction most people mean when they ask for a “floating” staircase.
A floating staircase is one of the things people most often ask for when they open up a landed house, and one of the least understood. It looks light because the structure is thin or hidden: a steel spine, treads with no risers, a slim rail. That is exactly why it needs more decisions from you than a conventional stair, not fewer. And one of those decisions comes with a surprise: for your own landed house, BCA’s rules do not make some of them for you.
This post covers what “floating” can mean, what BCA’s own page says is exempt in an owner’s landed house, and the list to settle before anyone orders steel. Where a stair decides whether a new level is worth having at all, as in a loft, is covered in an internal loft or mezzanine in a landed house.
What “floating” usually means
Three different builds get called floating. Which one you are being quoted changes the price, the lead time and the questions below, so have it named on the drawing.
- Treads on a single central steel spine. This is the one in the photo. The treads reach out from one steel member running up the middle. Our portfolio entry for the project describes it as cantilevered timber treads on a single steel stringer. Each tread is carried by the spine alone, with nothing under its outer end.
- Treads between two steel stringers at the sides. It looks open, but it is not truly floating, because each tread is supported at both ends. It usually feels stiffer underfoot, which is why it is a common compromise.
- Treads built into a wall. There is no steel in sight, so the wall is the structure, and it has to be a wall your engineer has confirmed can hold them. In many older landed houses the brick walls between the concrete columns and beams are infill rather than structure. That is not a rule, and it has to be confirmed for your house, never assumed.
What BCA says about a landed house built for the owner’s own use
Read this part twice, because it changes how you should approach the design.
BCA publishes a page called Exemptions for building works requiring approval. We read it on 16 October 2026, when it showed as last updated on 15 October 2026. It says that for building works that do need approval, landed houses built for the owner’s own use are exempt from some of the Building Control regulations, to give owners more flexibility in designing their own houses for aesthetics or lifestyle. Two of the exemptions apply directly to a staircase:
- Staircases. The requirements that a staircase has handrails or guides to assist movement, has landings to break a fall and provide a place for rest, and has sufficient width, tread and riser to avoid injury do not apply to landed houses built for the owner’s own use.
- Safety from falling. The requirements that a barrier is high enough to stop a person falling over the top, has no opening or gap a person can slip through, and has no feature that helps a person climb over it do not apply either.
Three things follow from that, and none of them is a reason to panic.
- The exemption is deliberate and lawful. It is part of why a stair with open treads, a thin spine and a minimal rail can be designed for a landed house at all.
- It removes the obligation, not the risk. Nothing in those rules will force the handrail, the tread or the gaps in the balustrade to suit a toddler or a grandparent. That becomes your decision, made with your builder and your QP. We are not saying a floating stair is unsafe. We are saying its safety is whatever you specified.
- Structure is not exempt. The same page’s summary table lists structural design and construction as “no exemption – compliance required”. The spine, its connections and what it is fixed to still have to be designed and certified.
The wording is “built for the owner’s own use”. If the house is going to be let or sold, ask your Qualified Person (QP) whether the exemption applies to yours rather than assuming it does. BCA itself advises owners to read that page together with their appointed QP.
The decisions to settle before steel is ordered
1. Who will use it
Children, older relatives, someone with a bad knee, someone carrying laundry or a baby. A stair that suits one household at one age is a different design from one the whole household uses every day for twenty years. Open treads are where a design for one household turns into a problem for the next.
2. The gaps
There are two kinds: the gaps between the treads, and the gaps in the balustrade. Ask the drawing to state the largest of each and what it is designed to. If your builder is working to the figures the regulations normally set, they will say so; if you are choosing your own, you should know what they are and why. Horizontal rails can work as a ladder for small children, so how the rail is built matters as much as how tall it is. Our metal works page says we build balcony railings to BCA height and spacing standards; the same question belongs on any stair rail you buy, from anyone.
3. The handrail
Ask where the handrail starts and stops, whether it runs the whole flight, and which sides have one. The rule that requires one does not apply to your house, so a stair can be drawn with none, and a floating stair with an open edge on one side and a wall on the other is easy to draw that way.
4. The treads
Have the material, the thickness and the finish named. A cantilevered tread is carried only where it meets the spine, so how stiff it feels underfoot depends as much on the steel and its fixing as on the timber. Ask your builder to show you a stair of the same type that is already built, and walk it. Ask what the finish is like in socks, and whether the steel and timber drum or creak when someone comes down at night.
5. The top and the bottom
Two things have to be right at the ends: where the stair lands, and what it is fixed to. Cutting or enlarging an opening in a floor slab is a structural alteration, so the opening goes through your QP and has to be final before the steel is drawn. Ask for the connection detail at both ends on the drawing, and ask when someone will check the steel connections before they are coated or covered. The checks worth asking for at that stage are in the stage checks before concrete is poured and structure is covered.
6. The finish, and the seven weeks
Our metal works page recommends powder coating for semi-sheltered decorative pieces, interior staircases among them, and hot-dip galvanising for anything heavily exposed to weather. That is the finish decision. The sequence decision is separate, and it is the one people forget.
On one of our live jobs, 37EW, the staircase balustrade was recorded as set on 29 July. On 15 September, with interior painting under way, the handrail and balustrade were being wrapped and taped. That is about seven weeks of plastering, tiling, screed and other trades working around that stair. The order that trades arrive in is in the finishing stage of a landed A&A. So ask who protects the stair during that time, and who touches up the coating at the end. Put both in the quotation.
7. The lead time
Our metal works page says a custom staircase typically takes 4–6 weeks from approved drawings to installed and finished: two weeks for fabrication, one for galvanising or powder coating and one for installation on site. It adds that it is faster for a simple straight staircase and longer for spiral, floating or large multi-flight builds. A floating stair is in the longer group. Ask for two dates: when the opening and the floor levels must be final, and when the steel has to be ordered by. Also ask whether the steel is made from the drawing or from measurements taken after the opening is formed.
What to write into the quotation
- The type, named, with a drawing: single spine, side stringers or wall-fixed.
- The treads: material, thickness and finish.
- The largest gap between treads and in the balustrade, and what it is designed to.
- The handrail: which sides, and where it starts and stops.
- Who designed the spine and its connections, and who certifies them.
- The finish system, who protects the stair while other trades work, and who touches up afterwards.
- The two dates: when the opening is final, and when the steel is ordered.
- Whether the steel is made from the drawing or from measurements taken after the opening is formed.
Two quotations for “floating staircase” can describe two quite different stairs. The difference is usually in the lines above, not in the margin.
The short version
- “Floating” can mean a single spine, side stringers or a stair built into a wall. Name which one.
- BCA’s exemptions page says the stair and safety-barrier requirements do not apply to landed houses built for the owner’s own use. The structural design still does.
- So the gaps, the handrail and the treads are yours to specify. Ask for each in writing.
- The stair goes in early and sits among other trades for weeks. Decide who protects it and who touches it up.
- Floating stairs take longer than straight ones. Ask for the date the opening must be final and the date the steel is ordered.
Planning a staircase in a house you are building or altering? WhatsApp us on 9107 2601 with the house type, where the stair goes and who will use it, and we will tell you what needs settling first. Wong Lye Pte Ltd holds a BCA General Builder Class 2 (GB2) licence and fabricates its own steelwork. See our in-house metal works and A&A works for landed homes.
Related reading: an internal loft or mezzanine in a landed house · why the staircase decides the mezzanine · the finishing stage of a landed A&A
Also worth reading: for the railing on that staircase, see Railing for a Stair or Loft Edge on a Landed House in Singapore: Mesh, Bars, Glass or Timber, and What Each Asks of You After Handover.
Also worth reading: the space under a finished staircase is the next question once the stair is built: Door Under the Staircase in a Landed House in Singapore: What the Space Behind It Needs Before the Door Goes On.