A&A Works · 3 October 2026

A&A or Renovation on a Landed House? Where the Line Is and Who Should Do Which Part

A&A or Renovation on a Landed House? Where the Line Is and Who Should Do Which Part

"We want to renovate the house" can mean two completely different jobs on a landed property. One is carpentry, paint, flooring and a new bathroom. The other is taking out a wall that holds up the floor above, or adding a room at the back. In conversation they are both called renovation. They are not the same in licensing, in approvals, in who is allowed to do the work, or in what goes wrong when the wrong person does it.

This is the line as we draw it at Wong Lye, a BCA General Builder Class 2 (GB2) working on landed homes, and the questions to ask so you hire the right kind of contractor for the part of the job you actually have.

The two-question test

Before you ask anyone for a quote, ask two things about your plan:

  1. Does it change the structure of the building? Removing a load-bearing wall, putting in a new beam or column, moving loads so a space can be open-plan.
  2. Does it add floor area? A new room, a side extension, an enclosed carport, an attic converted to a usable floor, a storey added on top.

If the answer to either is yes, it is heavy building work, and you need a BCA General Builder. If the work is interior refinishing - carpentry, paint, new flooring, new bathrooms without moving plumbing walls - you need a licensed renovation contractor, not a builder. That is the plain version of the rule, and it is the one we use on the first phone call.

What is clearly A&A

Addition and alteration is the structural and floor-area side. On a landed home it covers adding a room, extending a side, enclosing a carport, converting an attic, adding a storey, and altering structure: removing load-bearing walls, inserting new beams and columns, transferring loads for an open-plan layout.

A storey addition shows why the licence matters. It is heavy building work, so the contractor must hold a BCA General Builder licence. A renovation contractor cannot legally take it on, however good their finishing is.

What is clearly renovation

Paint. Carpentry. New flooring. A bathroom redone without moving the plumbing walls. This is finishing work on a structure that stays as it is. It does not need a builder, and often a builder is the wrong person to price it. When someone calls us and the project turns out to be renovation in disguise, we say so and point them to a renovation contractor rather than quote work that is not ours.

The grey area: "it's just a wall"

Most disputes start here. A wall you want gone looks like any other wall: same plaster, same paint, same door frame. Whether it carries the floor above is not something you can see by looking. Thickness, position and continuity are clues, but only the structural drawings or an engineer's physical assessment settle it. For the full method, see how to tell a load-bearing wall before you hack.

The practical point is the order of events. On the structural side, the calculations are run before any hacking begins. A contractor who starts hacking first and asks questions later is how a job ends up with emergency propping and a beam retrofitted afterwards. The same goes for "small" jobs that quietly touch structure or floor area; we go through what we check in what we check when you say "just a small A&A".

What changes once it is A&A

Three things change, and they are the reason the distinction is worth a phone call before you sign anything.

1. There are submissions. Anything that changes the building envelope, the floor area or the external appearance triggers a URA submission. Internal-only A&A within the existing floor area may go through a simpler process. The submissions are made by a Qualified Person - the architect or the professional engineer - not by the builder. What differs between builders is whether you are left to appoint and coordinate that person yourself. We coordinate the architect and the structural engineer in-house as part of one quotation, so the drawings, the URA and BCA submissions including structural certification, and the build sit with one accountable party.

2. The time includes approvals. A focused A&A typically takes 6 to 12 months from first meeting to handover, and submissions alone can take 2 to 4 months before any physical work begins. If you are planning around a move-in date, the approval period is the part people forget. A reconstruction, where the project has tipped over from A&A into rebuilding, takes 12 to 18 months. If you are unsure which side of that line you are on, read when your project stops being A&A and becomes a reconstruction.

3. Your existing structure matters. For homes built before 1990 we do a foundation review and a column-and-beam load calculation before quoting. Older houses were often built to standards that do not allow for today's heavier loads: an extra storey, heavier finishes, solar panels. Sometimes we recommend reinforcement first. Occasionally we recommend rebuilding instead. That check is part of how we quote and costs you nothing extra.

What goes wrong when the wrong contractor does the job

It goes wrong in two directions.

The first is the one everyone worries about: a renovation contractor takes on structural work. What you do not get is a General Builder's licence behind the job, calculations before the hacking, or a submission path. If it turns out the work needed approval, the problem lands on you as the owner.

The second is quieter. A package is built around structure when all you needed was a refresh, and you pay builder rates for work that did not need a builder.

Warranty makes the difference concrete. On a landed home, everything we build carries seven years from handover - structural, plumbing, masonry, partitions and windows - and each item in the quotation has its warranty period written beside it. But it covers what we built. If a job is not a complete structural A&A, we cannot warrant the existing structure we did not touch. On an extension we cover the new extension itself, but not the joint where it meets your existing house. Work carried out by others is not covered. So "who did which part?" is not an academic question: it decides who answers when something leaks in year three.

When you need both

Many landed projects need both, and the sequence matters. Structure first, then finishing. The structural work has to be done, checked and closed out before tiles, carpentry and paint go over it. If you plan to hire separately for the interior, ask your builder in writing where their scope ends and where the finishing starts, so nobody argues later about who was meant to make good a wall.

Questions to ask before you hire

  • Does my plan change structure or add floor area? Ask the contractor to say yes or no, and why.
  • Is the contractor licensed for what I am asking? For heavy building work, the General Builder licence and its class can be checked on BCA's public register.
  • Who makes the URA and BCA submissions? A Qualified Person does, so ask who that is and whether they are inside the quotation or left for you to appoint.
  • Are structural calculations done before any hacking? For any wall you want removed, the answer should be yes, in writing.
  • Is the house older than 1990? If so, ask whether a foundation and column-and-beam load check is part of the quote.
  • What does the warranty cover, item by item? And what does it exclude, including the joint with the existing structure?
  • Where does the builder's scope end and the finishing begin? Get it into the quotation.

The short version

If it touches structure or adds floor area, it is A&A and needs a licensed builder, submissions and time for approvals. If it is paint, carpentry, flooring or a bathroom with the plumbing walls left where they are, it is renovation and needs a renovation contractor. Anything in between, find out before you sign - the answer decides the licence, the approvals, the timeline and who stands behind the work.

Not sure whether your plan is A&A or renovation? WhatsApp us on 9107 2601 and tell us about your house and what you want to do. Wong Lye Pte Ltd holds a BCA General Builder Class 2 (GB2) licence and builds A&A works, extensions and reconstructions on landed homes. See A&A works for landed homes.

Related reading: what we check on a "small" A&A · load-bearing walls · A&A or reconstruction

Live jobs

Common questions
What is the difference between A&A and renovation on a landed house?
A&A (addition and alteration) changes the structure of the building or adds floor area: a new room, a side extension, an enclosed carport, a converted attic, an added storey, or removing load-bearing walls. Renovation is interior refinishing such as carpentry, paint, new flooring and bathrooms where the plumbing walls do not move. A&A needs a BCA General Builder and submissions; renovation needs a licensed renovation contractor.
Can a renovation contractor do a storey addition in Singapore?
No. A storey addition is heavy building work, so the contractor must hold a BCA General Builder licence. A renovation contractor cannot legally take it on.
Does A&A on a landed house need URA approval?
Almost always. Anything that changes the building envelope, the floor area or the external appearance triggers a URA submission. Internal-only A&A within the existing floor area may go through a simpler process. The submissions are made by a Qualified Person, meaning the architect or the professional engineer, not by the builder.
How long does a landed A&A take compared with a renovation?
A focused A&A typically takes 6 to 12 months from first meeting to handover, and the submissions alone can take 2 to 4 months before any physical work begins. A full reconstruction takes 12 to 18 months.
Can I tell whether a wall is load-bearing just by looking?
Not reliably. Thickness, position and continuity are clues, but only the structural drawings or a physical assessment by an engineer can confirm it. Structural calculations should be done before any hacking begins.
What does a builder's warranty cover if I split the job between a builder and a renovation contractor?
It covers what the builder built. If a job is not a complete structural A&A, the builder cannot warrant the existing structure they did not touch. On an extension, the new extension is covered but not the joint where it meets the existing house, and work carried out by others is not covered.
← Back to Journal

Have a Question We Haven't Answered Yet?

Most of our articles start as questions from WhatsApp conversations. If there's something you wish a builder would explain honestly, send it to us.

Send Us a Question →